2) surface runoff modeling
地表径流模拟
1.
The quality of surface runoff modeling is limited by horizontal and vertical accuracy of digital elevation model.
用数字高程模型进行地表径流模拟时 ,由于网格精度和高程精度的限制 ,使得在某些局部的模拟结果不理想。
3) Surface water modeling system
地表水模拟系统
4) Hydrological Flow Modeling
地表流水模拟算法
5) surface simulation
表观模拟
1.
The development of surface simulation system of 3D braided preform;
三维编织预制件表观模拟系统的开发
2.
According to the practical need, the arithmetic of 3-D tapered braided preform surface simulation is designed, and after the computer programming and testing, the surface simulation of four-step 3-D tapered braided preforms is achieved.
对四步法三维编织减纱预制件表面外观进行了分析,结合实际工作需要,设计了三维编织减纱预制件的计算机表现模拟算法,并经过编程和测试实现了四步法三维编织减纱预制件的计算机表观模拟。
6) mimotope
模拟表位
1.
Identification and application of 7 peptide mimotope which binded to monoclonal antibody of anti-deoxynivalenol;
脱氧雪腐镰刀菌烯醇七肽模拟表位淘选及应用
2.
Screening of LPS mimotope by phage-displayed peptide library;
利用噬菌体肽库筛选脂多糖的模拟表位
3.
Development and preliminary identification of the attenuated Salmonella typhimurium vaccine expressing the gastric cancer MG7-Ag mimotope;
表达胃癌MG7-Ag模拟表位的减毒鼠伤寒杆菌疫苗的研制和初步鉴定
补充资料:地表沉陷
由地下采空区顶板的冒落所造成的地面变形。在长期承载过程中,采空区矿柱系统中一些最薄弱部位往往会因风化、地震等作用而首先破坏。局部破坏的累积,最终波及整个系统。一般当矿柱的破坏率超过60%时,采空区顶板就要发生冒落,并或多或少地波及到地表。大范围的采空区顶板冒落通常是突发性的,往往伴随有强烈的气浪冲击,且多引起地表沉陷和张裂,造成地上或井下建筑物的破坏。有时,沉陷中形成的裂缝还可使地表水或地下水大量流入井下,直接威胁采矿工作的安全。如湖南锡矿山南矿就曾多次发生大规模的采空区冒落。最大一次冒落面积达34000平方米,使地表产生急剧的下沉和张裂,最大下沉量达1.075米,下沉范围近96000平方米,致使地表的一些井架和烟囱偏斜和弯曲。通常,地表沉陷的范围大于采空区。沉陷洼地的边界与采空区边界连线的倾角称移动角,是预测沉陷范围的重要数据。除此之外,最大沉陷量和下沉速度也是评价开采沉陷的重要指标,可根据经验公式进行预测。为防止这类沉陷的发生,应在采掘中合理地设计矿柱系统及开采空间的大小,以保证采空区顶板的长期稳定。在可能发生地表沉陷的地区进行建设,应采取结构措施保证建筑物不被破坏。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条