说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 固井工艺
1)  cementing technology
固井工艺
1.
Based on the summarization on foreign research development in cement slurry systems for deepwater cementing,cement displacement technology,cementing equipment,cementing technology and investigation on the long-term isolation capability of cement sheath,the fo.
在总结国外深水固井水泥浆体系、注水泥顶替技术、固井设备、固井工艺和水泥环长期封隔性能研究现状的基础上,指出深水固井技术研究应以固井体系设计简单和施工方便为前提、以"对环境友好"为原则、以水泥环实现长期封隔为目的。
2)  Techniques of drilling and cementing
钻井固井工艺
3)  balanced cementing technology
平衡固井工艺
4)  KEY TECHNIQUES FOR TWO STAGE CEMENTING
双级固井关键工艺
5)  completion technique
完井工艺
1.
The three series of completion techniques(conventional perforation,TCP and new completion) are formed including fourteen technologies,which are adaptable to different geologic settings and hole conditions.
综述了大庆油田目前完井工艺技术现状。
6)  drilling technology
钻井工艺
1.
Study on drilling technology beneficial to coalbed protection;
煤层气井储层保护钻井工艺
2.
Discuss new well cementation way of well drilling technology;
钻井工艺中固井新方法的探讨
3.
The geologic factors and mechanical drilling technology was analyzed.
通过合理降低上部大井眼岩屑切削面积及合理增加中下部复杂井段井身结构,采用先进的钻井工艺技术,进一步优选了钻头,试验和推广了低压和负压钻井等新工艺新技术,加强了对固控技术的研究,改进了现有钻井工艺。
补充资料:固井


固井
sealing of drop-shaft bottom to rock

  gUJ,ng固井(sealing of drop一shaft bottom to roek)在竖井沉井法掘进中将沉井井筒永久固定的技术。当沉井下沉达到设计深度后,为防止井筒继续下沉或出现位移,需采取加强井壁和土帮的固定措施,以隔离井筒与井外含水层的水力联系,这是沉井施工的最后一道工序。固井采取的主要措施是联接套井与沉井的上口,井筒壁后注浆以增加侧面阻力,砌筑沉井基座以增加正面阻力,最终使井筒保持稳固。 在固井之前,若刃脚坐落的基岩上面无隔水粘土层,则需构筑封底止水垫,以防止井内排水后,发生涌砂冒泥或突水事故。封底后,首先要清除套井与沉井之间的泥浆,然后在其中浇灌片石混凝土,同时将沉井上口的钢筋与套井锁口的钢筋焊接好,并浇灌混凝土,使沉井与套井连成整体。最后,排除井内积水,进行壁后注浆。一般采用分段下行、分段内上行式注浆方法。当采用泥浆护壁减阻时,要先注清水,把泥浆置换出来后,再注水泥浆。井底筑有止水垫时,要进行工作面预注浆。待浆液凝固后,破除封底止水垫,在基岩中砌筑沉井基座。待基座砌好,沉井施工结束,即转入井筒普通法掘进。 (石达民)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条