1) queue measure method
排队计分法
1.
This paper analyzes general integra ted evaluate method in practice that exponent method,efficacy coefficient method,optimization d istance method and queue measure method,and indicates their strongpoin t and shortcoming.
剖析了目前实际工作中应用较多的几种常见的常规综合评价方法———指数法、改进后的功效系数法、最优值距离法以及简便易行又有广泛实用价值的排队计分法,并指出了其优点和局限性,也指出了这些方法的适用场合。
2) queuing algorithm
排队算法
1.
A dynamic self-adapting queuing model and the queuing algorithm were proposed.
提出了一种动态自适应排队模型,并设计了相关排队算法。
3) queue-service net
排队网法
1.
The methods of queue-service net and event scheduling are utilized to model the assembling line and simulate its running process.
以某汽车变速器装配线为例,利用可视化仿真实现了对装配线的设计与管理,采用排队网法对装配线进行建模,用事件调度法模拟装配线的运行过程,并通过仿真系统实验,确定了满足设计要求的AGV数量及合理的调度管理装配线方法。
4) queuing analysis
排队分析
1.
By means of queuing analysis and network simulation,the measurability of end-to-end minimum packet delay has been quantificationally analyzed,and it was found that 50 packets was more than enough to measure the minimum delay of a 10 hops long path with very great probability.
以排队分析和网络仿真为手段定量分析了在不同路径长度和流量负载条件下的最小时延可测性,发现约50个探测包即可有很大概率测量到有10跳长路径的最小时延。
6) demining section
排雷分队
补充资料:部件计分法
部件计分法
计分法》则能够较好地体现宏观与微观、总体与局部的结合,因此也就能够更好地体现按质论价的房屋评估的基本原则。实践也表明这种方法对于建筑结构关系简单,单件性强的平房和中式砖木结构楼房的价格评估来讲较为适用,不失为一种好方法。而将《部件计分法》推广到现代楼房(西式楼房)的价格评估中就暴露出不少矛盾和问题。【部件计分法】基本原理就是将整幢房屋按其结构分解为屋顶、房架、墙身、地面、装修、设备六大部件,按每一部件所使用建筑材料的不同划分为若干等级,根据房屋评估条件制定不同部件等级标准,分别评定分数、计算总分,然后通过分值折算,从而确定所评估房屋的价格。《部件计分法》作为北京市房屋价格评估的基本方法于五十年代初产生、形成,应用至今,由此构成《北京市房屋估价办法》核心内容。这种方法与全国其他城市常采用的《分等论级法》相比较有其自己的特色。《部件
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条