2) risk index assessment model
风险综合指数评估模型
3) multi-objective synthetic evaluation
多指标综合评估
1.
In this paper,a method of ameliorative multi-objective synthetic evaluation based on entropy weight is presented.
提出了一种基于熵权的改进型多指标综合评估方法。
2.
This paper constitutes evaluation index of operational benefit in equipment maintenance organization, and a arithmetic of multi-objective synthetic evaluation based on entropy weight is put forward.
本文在建立装备维修组织运行效益评估指标体系的基础上,提出了一种基于熵权的多指标综合评估算法,并以实际例子进行了具体的模型仿真和结果分析。
4) integrated assessment
综合评估
1.
Methods of investigations and integrated assessments of the nationwide mine geoenvironment;
全国矿山地质环境调查与综合评估技术方法探讨
2.
Design and realization of power plant reliability integrated assessment system;
发电厂可靠性综合评估系统设计与实现
3.
Basic thinking and framework for earthquake risk integrated assessment of natural gas pipeline
天然气管道地震风险综合评估基本思路与框架
5) comprehensive assessment
综合评估
1.
Fire comprehensive assessment becomes very difficult as the complex nature of the fireprocess and the intervention into the fire process by human being.
火灾的综合评估,由于火灾过程的复杂性和人类于预的介入而变得比较困难。
2.
The uncertain type of analytic hierarchy process(AHP) method,fuzzy theory and set-valued statistics theory are applied to the comprehensive assessment of long span cable-stayed bridges,and then an index system and an assessment model are proposed for comprehensive assessment of cable-stayed bridges.
将不确定型层次分析法、模糊理论、集值统计原理等方法应用于大跨度斜拉桥的综合评估中,建立了斜拉桥综合评估的指标体系和评估模型,并通过哈尔滨松花江斜拉桥综合评估的实例,证明了该评估体系的可行性与实用性。
3.
Aiming at the ruzziness existing in the comprehensive assessment of geologic hazards,the calculation method and procedure of comprehensive index method and AHP methhod in comprehensive assessment of geologic hazard is introduced.
针对地质灾害危险性综合评估存在的模糊性,介绍了综合指数法及AHP法在地质灾害危险性综合评估中的计算方法及步骤。
6) integrated evaluation
综合评估
1.
Research on the integrated evaluation approach to the effectiveness of the interoperability of combat systems;
作战系统互操作应用效能的综合评估方法
2.
An integrated evaluation method for complex systems condition based on mission sections;
基于任务剖面的复杂系统状态综合评估方法
3.
Moreover,an integrated evaluation table was designed to decide whether the coil box would be adopted by enterprise.
分析了带钢热连轧中热卷箱的优势以及存在问题,并提出了选用热卷箱的综合评估方法,即应综合衡量建设场地、投资、轧制速度、轧制钢种、轧制节奏、节能降耗、轧件温度和表面质量等。
补充资料:迁移效率指数、偏好指数和差别指数
迁移效率指数、偏好指数和差别指数
迁移效率指数、偏好指数和差别指数迁移效率指数是用于测定两地间人口迁移效率的指标。它是净迁移对总迁移之比。计算公式为:EIM一摇寿纂拼又‘。。上式中,}人么夕一材方}为i、]两地净迁移人数;从少+材户为i、]两地总迁移人数;El入了为迁移效率指数。 EIM的取值范围为。至100,如某一地区的值越大,反映迁移的的影响也越大。如果计算i地区与其他一切地区之间的人口迁移效率指数EIM厂,则: }艺材。一芝Mj、}EIM汀艺。+乏M,(j笋i) 迁移偏好指数是从一个地区向另一地区的实际迁移人数与期望迁移人数之比。计算公式为:____M.___材尸2行一:一二子一一不石一二,么M“ 了厂‘.厂‘、八 }二不十二六二1 、厂厂7上式中,M“为从i地迁到j地的实际迁移量;艺材。为总的人口迁移量;尸为总人口;M尸I,j为迁移偏好指数。通过计算迁移偏好指数,可以反映各地区的相对引力。 迁移差别指数是反映具有某种特征的迁移人口与非迁移人口区别的指数。例如,专业技术人员的人数所占比重,各种文化程度人数所占比重等,以便研究人才流失和其他间题。计算公式为:M‘从IMD、一翌不丝xl。。 .义V‘ N上式中,M为迁移人数;M,为具有i特征的迁移人数;N为非迁移人数;N‘为具有i特征的非迁移人数;了八了D、为迁移差别指数。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条