1) loose ice-dam
虚冰坝
2) ice dam
冰坝
1.
Hydraulic and thermodynamics factors analysis on ice dam formation in Emuer River;
额木尔河冰坝形成的水热因素分析
2.
Forming conditions and forecast for ice dam on the lower reaches of Songhua River;
松花江下游冰坝形成条件及预报成果
3) ice jam dam
冰坝
1.
It based on the analysis of the condition about the form of the ice jam dam,hydrodynamic and thermodynamic factor,studied the cause of ice jam dam and the way of ice jam dam forecast,the article emphasized the analysis and account of water.
介绍了松花江河道特性、水文气象特征、历史冰坝凌汛灾害情况。
4) ice jam
冰坝
1.
The causes,characterstics and water heat of ice jam flood in the Songhua River is described in this paper.
1957年黑龙江中游支流、额尔古纳河及部分支流,嫩江、松花江干支流,乌苏里江干流和大部分支流普遍出现了冰坝凌汛。
2.
Based on the analysis of cause condition of ice jam, the classical hydrological method is adopted, i.
在分析冰坝成因条件的基础上,采用经典的水文方法,即融雪和融冻期降雨径流模型计算冰坝入汇水量,以断面流量计算河网结冰水量,以历时因子法计算冰盖临界强度,对寒冷山区性河流冰坝成因进行了计算分析,提出了冰坝成因的判别公式,对冰坝成因进行了分类。
3.
The ice jam happened from Jan.
对牡丹江长江屯站2009年1月5~7日形成的冰坝的概况、河道特性、冰坝特征及成因进行分析,以期为冰坝预测及凌汛分析等相关研究提供参考。
5) breakup ice-jam
开河冰坝
6) ice-jam prediction
冰坝预测
1.
The existing breakup ice-jam prediction methods and their potential advantages and disadvantages were briefly reviewed.
对国际上现有各种冰坝预测模型进行分析比较,并讨论了各自的优缺点。
补充资料:冰坝
冰坝
ice dam
b一ngbo冰坝(ice dam)河流解冻时.由上游流下的大量冰块受阻,形成的冰块堆积体。其外形如图所示。冰坝严重堵塞河道,使上游水位童高,造成上游城镇及平铺冰块堆积冰块*i了、,,冰坝示意图工矿区受淹,或抬高水电站尾水位,减少发电量。当冰坝承受不住上游河段的冰和水压力时即自然演决,大t流冰突然下泄,撞击沿河两岸建筑物,会造成较大损失。冰坝持续时间较短,一般仅几天。 形成条件①动力条件。解冻开河时上游来水量增加,或封冻时河槽蓄水量大,在解冻时下泄并逐段累积,是形成冰坝的必要条件。②河道形态。游荡性河道及河棺宽、窄、深、浅变化大的河道易形成冰坝。③河流流向。由低纬度向高纬度流动的河流(段),由于上游气温高于下游,上游先于下游开河,则大量冰块受阻于下游冰盖前而形成冰坝。如黄河内蒙古河段和山东利津河段,以及东北的黑龙江上游和松花江下游。 防止措施可概括为3类:①利用上游水库调节流量。下游河道封冻前加大泄流量形成较高的冰盖,增加冰盖下过水面积;解冻时减少下泄流量或适时分水,是防止形成冰坝的有效措施。②破冰。一旦冰坝形成,可采用爆破、飞机轰炸、炮轰、破冰船撞击等破冰方法,或撤土融冰。③冰情预报。掌握冰情变化,可及早采取措施,防止形成冰塞、冰坝等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条