说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 调运计划
1)  dispatching planning
调运计划
1.
Then dispatching planning model is established according to the rules that include achieving quantity discount,just-in-time p.
本文首先给出了大宗物资集中采购的调运模式,然后针对采购部门在大宗物资调运过程中遇到的困难,为采购部门提出了以获取数量折扣、准时采购、降低库存成本和协调运输能力为准则的调运计划模型。
2)  The scheduling problem of hump locomotive
调机运用计划
1.
The scheduling problem of hump locomotive in marshalling station can be described as a single machine scheduling problem with distinct due window and the object of optimization is minimizing the total number of weighted tardy trains.
编组站调机运用计划为具有不同开工、完工时间窗口的单机调度问题,优化目标是最小化晚点列车的数量。
3)  Operation and offtake program
调度运行计划
4)  Relaxation operation adjustment plan
松弛运行调整计划
5)  plan of adjusting train operation
列车运行调整计划
6)  Train Movement Adjustment
列车运行计划调整
补充资料:调运
调拨和运输:~工业品下乡。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条