1) stock-out times
缺货时点
1.
Based on games model,this paper studies Nash equilibrium problem of supplier and buyer s stock-out times and reorder frequency under time-varying demand and no alternative source.
本文基于博弈模型,研究在时变需求和无替代供应源的环境下供需双方缺货时点和补货次数的纳什均衡问题,并通过算例,具体分析了供需之间的关系,主要结论有:配送商的补货次数越大,零售商库存成本越小;补货次数优化后零售商与配送商的库存成本明显下降。
3) Time-phased Order Point
时相订货点
4) backorder
缺货
1.
Fuzzy inventory model with defective rate and shortage backordering;
考虑缺陷率和缺货的模糊库存模型
2.
A pair of(1,R) and(M,1) EOQ(economic ordering quantity) models are proposed for a remanufacturing setting with scrapping and backorder.
研究了一种新型的再制造条件下考虑废弃处理并且允许缺货的(1,R)和(M,1)一对EOQ模型。
3.
This paper investigates the inventory problem for items received with imperfect quality and backorder allowed in the fuzzy environment.
本文研究了模糊环境中产品存在质量缺陷情况下允许缺货的库存模型,运用更为一般的LR型模糊数表示缺陷率、缺货成本、订货成本、需求等可能出现不确定情况的参数,建立经济订货批量模型,并运用符号距离法对模型进行反模糊化,确定了使总利润最大化的最优订货批量。
5) stock-outs
缺货
1.
In inventory management of supply chain, it is usually assumed that the losses resulted by stock-outs are afforded by the clients.
在供应链库存管理中,往往都是由客户承担缺货所带来的各种损失。
2.
In e-marketplace transaction,stock-outs become an inevitable phenomenon.
在电子市场交易中,缺货是不可避免的,但往往都由购买商承担缺货所带来的各种损失。
6) shortage
[英]['ʃɔ:tɪdʒ] [美]['ʃɔrtɪdʒ]
缺货
1.
An Inventory Model Considering Shortage and the Change of Demand;
一种需求率随时间变化且允许缺货的库存模型
2.
Economic production quantity models for items with defective rate and shortages in fuzzy environment;
模糊环境下含缺陷率且允许缺货的经济生产批量模型
3.
Production inventory model for a one-vendor one-buyer integrated system with shortages;
考虑允许缺货的供货商与销售商联合生产库存模型
补充资料:时点指标
时点指标反映现象在某一时刻(瞬间)状态上的水平。例如月末物资库存量、
年末职工人数、存款余额等。时点指标与时期长短没有直接关系,且不具有可加
性。
年末职工人数、存款余额等。时点指标与时期长短没有直接关系,且不具有可加
性。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条