1) Hefangkou low-angle normal fault
河防口低角度正断层
2) Hefangkou-Shuiyu "extension type" ductile shear zone
河防口正断层
3) low-angle normal fault
低缓角度正断层
1.
with flat-lying axial surfaces,resting on bedding planes and low-angle normal faults,occurr on the limbs of the major map-scale folds.
在大型褶皱翼部,发育一系列中小型褶皱(其振幅从几米至上百米),如屋顶和墙壁状构造、膝状褶皱、平卧褶皱、翻转及叠褶构造等,覆于层理面及低缓角度正断层面之上。
4) Low angle normal fault
低角度正断层
1.
Through fault structural indications analysis in the Xingbei deep part exploration area,considered that part of originally recognized high angle normal faults actually are medium to small low angle normal faults derived from detachment structural zone in eastern part of Zanhuang metamorphic core complex,Taihangshan uplift.
通过邢北深部勘查区钻孔中所见的断层构造迹象分析,认为原来部分定为高角度的正断层是受太行山隆起赞皇变质核杂岩东侧拆离构造带影响而派生的中、小型低角度正断层。
5) lower angle detachment fault
低角度拆离断层
1.
A series of golden deposits associated with lower angle detachment faults widely developed in the northeast of Jiaolai basin, Guocheng region, Haiyang County, Shandong Province.
山东省海阳市郭城地区位于胶东地块的东部、胶莱盆地的北侧 ,发育着一系列与低角度拆离断层有关的金矿床。
6) Heihekou fault
黑河口断层
1.
The Heihekou fault ,being apart 30 km from Zhangye in the southwest ,is a reversed fault which trends to the northwest and dips to the southwest.
黑河口断层位于张掖西南约30km,是一条走向北西,倾向南西的逆断层。
补充资料:《至正河防记》
元至正十一年(1351)黄河大规模堵口工程的技术总结。欧阳玄著。至正四年,黄河在白茅(今山东曹县境内)及金堤决口北流。至正十一年,贾鲁以工部尚书兼总治河防使主持堵口。四月开工,十一月堵口完成,黄河主流复行原道,东南经徐州等地入淮归海。朝廷特命翰林学士承旨欧阳玄撰制河平碑文,表扬功绩。欧阳玄向贾鲁访问堵口方略,并咨询有关人员,查阅施工档案,创作此《记》,详述施工技术和过程是本书的特点。它指出当时施工方法有三:疏(分流减涨,因势利导),浚(河槽清淤除障),塞(拦截决水从而堵口)。疏浚分四类:挖生地为新槽,避弯取直;浚故道使高低相配,有一定坡降;整治河身,使堤距宽窄适应水势;开减水河,使涨水有所分泄,减轻主槽负担。施工步骤是:疏浚决口前原道及减水河,总长280多里;修筑堤防,如北岸自白茅河口向东曾修堤254多里;先堵较小缺口107处及豁口4处,最后堵塞主要决口修筑截河大堤(即堵口大坝)长19多里;创造了用装石沉船法筑成的挑水坝(石船堤),挑溜归入主河槽,减轻决河口门流势等。这些工程实践,代表了14世纪中国水利科技成就和水平,在河工史上具有重要地位。《至正河防记》流传广泛,也造成某些讹误。《元史·河渠志》及《新元史·河渠志》均转录全文。单行本较为通行的有1936年中国水利工程学会《中国水利珍本丛书》本和同年商务印书馆《丛书集成》本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条