说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 冰塞水位
1)  increase in stage associated with ice jam
冰塞水位
2)  ice cock
冰水旋塞
3)  ice plug
冰塞
1.
Analysis and processing on ice plug phenomenon of the ship s cold storage refrigeration system;
船舶冷库制冷系统冰塞故障分析及处理
2.
Analysis on the causes of ice plug phenomenon in marine freon refrigeration plant;
船舶氟利昂制冷装置冰塞故障解析
3.
Different diagnosis methods for the common faults in the refrigerating plant were stated such as the compressor switching on frequently,ice plug,performance of the evaporator becoming lower,and the compressor running ceaselessly.
从压缩机启动频繁、冰塞、蒸发器性能降低,压缩机运转不停等方面阐明各种常见故障的诊断方法,并着重从船舶制冷装置操作管理角度提出相应的对策和避免上述故障的有效措施。
4)  ice jam
冰塞
1.
Investigation of reasons of ice jam in the lower reaches of the Yellow River in 2005-2006 and countermeasures;
2005—2006年度黄河下游冰塞成因及对策分析
2.
Formation of ice jam and calculation of backwater;
河流冰塞的形成与壅水计算
3.
Accumulation and evolution of frazil ice jam;
水内冰冰塞堆积演变的研究
5)  water gauge cock
水位表旋塞
6)  gauge cock
试水位旋塞
补充资料:冰塞


冰塞
ice jam

匕一r lgsC】l冰塞(i co Jam)河流封冻初期.在冰盖卜因大量冰花冰块堵塞部分过水而积.造成!_游水位雍高的现象。示意如图。 冰塞的形成需具备条件为:}有足够的来冰址.是形成冰塞的必要条件上游必须是未封冻的河段.水流才能与寒冷的大气进行热交换.产生大址冰花及冰块、②河道地形条件冰塞一般发生在水流不畅,比降突然变缓的河段,如急弯及狭窄的河段或水库回水末端、封冻冰盖前缘处的流速需大到某临界仇,流冰及冰花才能潜人冰盖以下。i亥临界流速常用弗劳德(Fr。》[lt{)数判别 F二一v/丫万万式中Fr为弗劳德数;V为冰盖前缘的平均流速;g为重力加速度;H为平均水深。根据黄河盐锅峡水库回水末端产生冰塞的实测资料分析,F,)0.的时,冰花潜人冰盖下形成冰塞;当Fr<0.09时,冰花难于下潜,而在冰盖前缘平铺,使冰盖向上游发展。尾部.尾部过渡段艳定段头部 1660任1650娜健 1640 1630 1620 1610 1600头部过波段\面位冰水一一一冰花夕,,I厅刀河流孔家寺下川牛鼻子峡进口大川10上中庄l﹂二里半古城清大庄小川洗河口上周罗家何家里 冰塞体部位 中国黄河上游刘家峡河段,于1961年冬盐锅峡水库建成蓄水后,至1967年刘家峡水库建成前,连续5个冰期发生严重的冰塞塑水现象。冰塞塑水位较冬季平均水位高9 m.冰花最大堆积厚10余m,造成刘家峡大坝基坑及主要公路被淹。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条