1) cable maintenance flow
电缆维修流程
2) WACS Wire And Cable Service
电线电缆维修
3) cable repair ship
海底电缆维修船
4) repair process
维抢修流程
1.
The corresponding repair process is established to provide the guidelines for the pipeline operation company to repair the pipeline w.
针对天然气管道外腐蚀失效制定了相应的维抢修流程,用以指导管道运营公司在外腐蚀失效事故出现的情况下借鉴本流程对天然气管道进行抢修。
5) Maintenance plan flow
维修规划流程
6) maintenance flow
维修工作流程
1.
Introduced in this paper is the computerized maintenance management system (CMMS) developed with MAXIMO software at the Guangzhou Pumped Storage Power Station, including the configuration of CMMS, the characteristics of the modules of equipment management, standard operation plan, fault code system and preventive maintenance, and the design of standard maintenance flow.
介绍了广州蓄能水电厂利用 MAXIMO管理工具实施的计算机维修管理系统 (CMMS) ,包括系统的配置 ,系统的设备管理、标准作业计划、设备故障代码体系、预防性维修和设备维修管理等模块的实施特点 ,标准化维修工作流程的设计等内容。
补充资料:《铺设海底电缆管道管理规定》
《铺设海底电缆管道管理规定》
regulations on management of laying submarine cables and pipelines
Pushe haidi dianlan guandao guanli guiding《铺设海底电缆管道管理规定》(regulationson~a-gelllent ofl娜飞submanne eables and pi州ines)l卿年2月11日国务院颁布,自1989年3月1日起施行。其宗旨在于维护中华人民共和国主权和海洋权益,有序地铺设和保护海底电缆、管道,合理地开发利用海洋空间。中国海洋行政主管部门是铺设海底电缆、管道及为此所进行的“路由”调查、勘测与有关活动的主管机关。该规定在实际管理中,需根据不同管理对象和不同情况区别对待。对于中国的企业、事业单位铺设海底电缆、管道的活动,主管机关主要对其所要铺设的“路由”实施审批,以实现科学、有序的铺设和正常使用与保护;对于外国的公司、企业和其他经济组织或个人在中国的内海、领海范围内铺设海底电缆、管道以及为铺设所进行的“路由”调查、勘探活动,则必须按规定事先向主管机关提出书面申请,获准后方可实施。外国作业者在中国大陆架上进行上述活动,除应事先通知主管机关外,其最后确定的“路由”须经主管机关同意。此外,该规定对海底电缆、管道的保护、维修、改造、拆除和废弃也作了相应的规定,并将收集海底地形、海上构筑物分布等方面的资料以及提供咨询服务作为主管机关的义务加以规定。 (赵恩波)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条