1) cumulative strike-slip displacement
累积走滑位移量
1.
The maximum cumulative strike-slip displacement of the Altyn Tagh Fault——900 km?;
阿尔金断裂带最大累积走滑位移量——900km?
2) cumulative offset
累积位移量
3) accumulative sliding
累积滑移
1.
During the process of hydraulic synchronization and accumulative sliding in steel roof of National Stadium,some measures including computer synchronous control are adopted to make steel roof perch with high efficiency,smoothly and exactly through rationally setting up slide way and sliding propeller.
国家体育馆钢结构屋架液压同步累积滑移过程中,通过合理设置滑道、滑移推进器,采用计算机同步控制等措施,使钢屋盖高效、平稳、准确就位。
2.
Combing the construction mechanics and the control of the initial length of cables,this paper proposed a calculation method for the accumulative sliding construction of pretensioned reticulated structures.
将施工力学与控制索原长法相结合,提出了预应力网壳结构累积滑移施工中的计算方法。
6) slip deficit
位移累积滑动亏损
1.
According to the features of displacement cumulative slip deficits in the northern margin of the Western Qinling and considering the scale of barriers, the difference of slip rates and the features of historical earthquakes and palaeoearthquakes et al, we discussed the rupture segmentation of this fault zone.
根据西秦岭北缘断裂带的水平位移分组特征, 定量计算了断裂端部和不连续部位的位移累积滑动亏损率, 同时结合断裂带上的障碍体规模, 滑动速率的差异, 历史地震及古地震特征等, 对断裂带进行了破裂分段性研究。
补充资料:累积增长量
累积增长量
【泉积增长t】以某一固定时期作为基期,报告期水平减去某一固定时期水平(通常为最初水平)的差额。它说明一段时期内总的增长(减少)量。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条