说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 离散时间-费用权衡
1)  discrete time-cost trade-offs
离散时间-费用权衡
1.
The discrete time-cost trade-offs problem(DTCTP) with bi_criteria optimization model is a most widely concerned in project scheduling literatures,which has been studied under three possible forms: 1)P1: the deadline problem.
离散时间-费用权衡问题(DTCTP)是项目进度文献中被研究最多的双目标优化问题,它通常以三种形式出现:1)P1:截止日期问题;2)P2:预算问题;3)P3:工期-费用曲线问题。
2.
The discrete time-cost trade-offs problem(DTCTP,for short) is a most widely concerned with bi-criteria optimization model in project scheduling literatures,which has been studied under three possible objectives.
离散时间-费用权衡问题(DTCTP)是项目进度中研究最多的双目标优化问题,它通常以三种形式出现:(1)P1:截止日期问题,在项目截止日期约束下使完成项目的总费用最小;(2)P2:预算问题,在费用预算约束下使项目工期最短;(3)P3:工期-费用曲线问题,找出全部有效的工期-费用模式集合。
2)  time/cost trade-offs
时间-费用权衡
1.
In the project management,the project s duration can often be compressed by accelerating some of its activities at an additional expense,this is the so-called time/cost trade-offs problem(for short,TCTP),which has been studied extensively in the project scheduling literatures.
项目管理中,通过增加额外费用来加速执行项目的某些活动,以此达到缩短项目工期的目的,这就是在项目调度文献中被广泛研究的时间-费用权衡问题。
3)  time-cost trade-off
时间费用权衡
4)  time-cost tradeoff problem
时间-费用权衡问题
1.
The research on time-cost tradeoff problem started from the early 1960s and the relative scope has expanded a lot in the following decades.
对时间-费用权衡问题的研究始于上世纪六十年代初,并且所涉及的范围在随后的几十年中大为扩展,但在问题的解决上却一直未取得突破性进展,最主要的瓶颈就是解决该类问题时所遇到的高复杂度和大计算量。
5)  discrete time-cost trade-off
离散时间成本平衡
6)  discrete time/cost trade-off
离散时间/成本平衡
补充资料:离散时间周期序列的离散傅里叶级数表示
       (1)
  式中χ((n))N为一离散时间周期序列,其周期为N点,即
  式中r为任意整数。X((k))N为频域周期序列,其周期亦为N点,即X(k)=X(k+lN),式中l为任意整数。
  
  从式(1)可导出已知X((k))N求χ((n))N的关系
   (2)
  式(1)和式(2)称为离散傅里叶级数对。
  
  当离散时间周期序列整体向左移位m时,移位后的序列为χ((n+m))N,如果χ((n))N的离散傅里叶级数(DFS)表示为,则χ((n+m))N的DFS表示为
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条