说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 场地布设
1)  field planning
场地布设
1.
This paper introduced the field selection,field planning,vane production,observation methods,and record format of river-crossing leveling in detail.
详细介绍了跨河水准测量的场地选择、场地布设、觇板制作、观测方法、记录格式等内容。
2)  construction site layout
场地布置
3)  grounding layout
场地布局
4)  site design
场地设计
1.
In complex environment,it is very important whether the nature terrain simulation is accurate,and the simulation result can affect site design and earthwork calculation.
在复杂地形的环境下,对自然地形的模拟是否准确关系到场地设计和土方工程计算,是土方工程的关键。
2.
Among the factors influencing the site design,block shape and altitude difference are the main problems for us to deal with, which will determine the partition of architecture colony functional area.
本文通过对重庆市渝北区龙塔中学场地设计中遇到的矛盾问题及其解决对策的分析,归纳了对于场地设计中对地形及地势高差处理与利用的方法,探讨了在较为复杂的场地设计中应注意的若干问题。
5)  site planning
场地设计
1.
Aiming at current phenomena of neglecting site planning and design generally existed in domestic field of city planning and urban design, this paper makes analysis of the problems in terms of the integral conception, organi- zation of function, psychology of users and working style.
针对目前国内城市规划设计领域普遍存在的忽视场地规划设计的现象,对场地设计中整体观念、功能组织和使用心理等方面存在的问题进行了剖析。
2.
This paper describes the design of the New Hubei Theater which has a characteristicconcept, function layout, site planning and indoor acoustic design based on the featured historyand geographic environment.
本文介绍了新湖北剧场的设计,依其特有的历史、地理环境,进行了独特的设计构思、功能布局、场地设计及其室内声学设计。
6)  construction site
建设场地
1.
Method and implementation of assessment on aseismic performace of construction sites;
建设场地抗震性能评价的方法与实践
2.
Based on statistical analysis of land demand in control of coal mining area and reconstruction of squatter settlement,this paper discussed social benefit of sinking area as construction site and introduced involved technical measure with examples.
在统计分析了沉陷区治理与棚户区改造工程对土地需求的基础上,论述了利用沉陷区作为建设场地的社会效益;阐述了在沉陷区有条件建造建筑物的技术保证措施及工程实例;同时对规模性利用沉陷区进行工程建设存在的一些问题进行了探讨。
3.
In recent years the work of “Five-accessible to (road, railway, communication, water and electric power) and one-leveling (construction site)” for the construction site becomes more and more important with continuous new construction and expansion of large power projects, which will directly effect on the proper starting of the following works and cost of the whole project.
近年,随着多项大型电力工程不断新建和扩建,建设场地的“五通一平”工作越来越重要,它将直接影响后 续工程的正常开工和整个工程的造价。
补充资料:布设
1.布置。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条