说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 构造完成
1)  construction complete
构造完成
2)  The structure (became)
构造完(成)了
3)  complete construction
完全构造
4)  gestalten
完形构成
1.
The function of strengthening advertisement visual transmission in particular, which is in color emotion, gestalten, word image design and sensation design .
分析和研究的重点在于情感色彩、完形构成设计、文字的形象化设计以及感觉设计在强化平面广告的视觉传达中的作用。
5)  ore-forming structure
成矿构造
1.
The study of ore-forming structure has experienced a gradually deepening process, consisting of the following stages: single-structure ore control, composite-structure ore control, structure ore formation, and dynamics of ore-forming structure.
成矿构造研究由单个构造控矿→综合构造控矿→构造成矿→构造成矿动力学是逐步深入的过程。
6)  metallotectonics
成矿构造
1.
Author has first discovered a new type of copper deposit formed in imandrite porphyry vein in Xingshugou, and distinguished that the metallotectonics, which controlls No.
首次在杏树沟发现产于石英钠长斑岩脉中的铜矿 ,并鉴别出铜沟控制Ⅰ号矿体的成矿构造为热泉通道。
2.
The paper defines a set of metallotectonicses, which are interrelated together under a certain space-time domain and the same tectonic regine or some particalar geologic events, as metallotectonic series.
成矿构造系列指一定时空域中、同一构造体制下或某一特殊地质作用过程中形成的相互联系的一套成矿构造的总和。
补充资料:成本计划完成情况分析
  对企业成本计划完成情况进行的分析。一般包括:

  (1)全部商品产品成本计划完成情况分析。这项分析以本年实际成本和本年计划成本进行比较,确定其实际成本比计划成本的降低额和降低率,计算公式如下:

  全部商品实际成本比计划成本降低额=本年计划单位成本计算的商品产品总成本-本年实际单位成本计算的商品产品总成本  

  (2)商品产品成本项目计划完成情况分析。这项分析在现行成本报表中没按成本项目编制。因而需要将有关资料进和整理,根据计划数与实际发生数计算其计划完成情况。

  (3)产值成本计划完成情况。这是将成本与产值相比较。一现产值越大,相对成本额便越小,产值成本率便越小,企业的经济效益也就越好。其百元产值成本计划完成率的计算公式:
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条