2) islanded operation
孤岛运行
1.
Control strategy for micro-grid in net-connected and islanded operation
微型电网联网和孤岛运行控制方式初探
2.
The impacts of Yun-Guang ±800 kV UHVDC transmission to system stability of China Southern Power Grid(CSG) under the AC/DC parallel operation mode and the islanded operation mode are analyzed.
分析了云广直流输电系统在交直流并联运行及孤岛运行方式下其单极及双极闭锁对系统安全稳定的影响。
3) island operation
孤岛运行
1.
The paper describes the method of how to use FCB function of coal-fired power unites to keep island operation.
电网大停电后发电机组在没有任何外来电源的条件下进行"黑启动"是极为困难的,文章阐述了如何利用火电机组的FCB(甩负荷保护)功能使机组在电网事故时保持"孤岛运行",提出了利用机组FCB功能恢复电网的方案,详细介绍了机组FCB的功能和作用,从工艺、设备、控制等方面介绍了FCB的实施方法。
2.
In island operation of Yunnan-Guangdong ±800kV UHVDC transmission system, serous fundamental frequency overvoltage(FFOV) will be generated in the sending terminal AC system when DC system bipolar blocking.
云南-广东±800kV特高压直流输电系统送端孤岛运行方式下发生直流双极闭锁时,送端交流系统将产生很高的工频过电压。
4) island operation method
小岛运行
1.
This test introduces turbine unit of HEJIN Power Plant load rejection experiment,and successfully realizes unit load-rejection-island operation method;It is on trial to express that turbine group for regulation system dynamic characteristic satisfy operation request,and it is important to great turbine unit.
介绍了河津电厂汽轮发电机组甩负荷试验 ,成功地实现汽轮机甩负荷小岛运行方式 ;试验结果表明汽轮机调节系统动态特性满足运行要求 ,以及实现汽轮机小岛运行对大型机组运行的重要性。
5) islanding operation
孤岛运行
1.
Based on the calculation of the over-voltage level,energy of MOA and transient recovery voltage of AC filter breaker after the bipole is blocked under the islanding operation of Yun-Guang UHVDC,the requirements on MOA,AC circuit breakers as well as DC control and protection system etc were presented,and implementation scheme of overvoltage protection was also designed.
云广直流孤岛运行方式下发生直流双极闭锁时将在送端换流站交流系统产生幅值很高的过电压,孤岛运行过电压水平控制是决定能否孤岛运动的关键闪素。
2.
High amplitude overvoltage will occur in the AC system after the bipole blocking under the islanding operation of Yun-Guang UHVDC.
云广直流孤岛运行方式下发生直流双极闭锁时将在送端换流站交流系统产生幅值很高的过电压,孤岛运行过电压水平控制是决定能否孤岛运行的关键因素,因此利用EMTDC计算了不同运行方式下楚雄换流站交流侧的过电压水平、避雷器工况、交流滤波器断路器断口暂态恢复电压及容性开断电流,并分析比较了各种不同的过电压抑制措施,提出了利用换流变磁饱和特性短时限制过电压的措施方案和电气设备的技术参数要求,同时还探讨了直流闭锁后换流变和交流滤波器切除时间等对过电压的影响。
3.
With the introduction of IEEE 1547—2003 standard,the islanding operation of distributed generation(DG)is becoming more and more concerned in the electrical industry.
随着IEEE1547—2003标准的出台,分布式发电(DG)孤岛运行成为关注的热点。
6) decoupled mode
(电站)孤岛运行方式
补充资料:欧洲式期权、美国式期权与亚洲式期权
欧洲式期权、美国式期权与亚洲式期权
【欧洲式期权、美国式期权与亚洲式期权】期权合约所规定的权利有一定的时效期,过了失效日后,权利即行作废。一些期权规定权利仅能在有效期的最后一天执行,这种期权被称为欧洲式期权(ell功pean叩tions);另一些期权则容许在有效期内任何一天执行,这种期权被称为美国式期权(一~oPtions)。值得指出的是,虽名为欧洲式或美国式期权,但已无任何地理上的意义。由于欧洲式期权的规定过于严格,又出现了一种“改变的欧洲式期权”,它允许期权在一定的时间范围内进行交易。可见,美国式期权为期权购买者提供了更多的选择机会,因此,它的购买者也往往需支付更高的保险费。近年来无论在欧洲或美国,所交易的期权均以美国式为主,欧洲式期权虽仍存在,但其交易量已比不上美国式期权。 在so年代末期,市场上又出现了一种所谓亚洲式期权(asian ontions),但也无地理上的意义,其差别主要在于履约价值(exe而sev公此)的计算。以买权为例,无论是美国式期权或是欧洲式期权,执行权利所能得到的履约价值均为当时标的物的市价减去履约价格,再乘以合约所定的数量,但亚洲式期权的履约价值则为权利期间内标的物市价的平均(计算至履约日为止),减去履约价格,再乘以合约所定的数量。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条