1) East Asia/Pacific teleconnection pattern
EAP遥相关型
2) EAP teleconnection
EAP遥相关
3) East Asia-Pacific teleconnection pattern
东亚-太平洋(EAP)遥相关型
4) teleconnection pattern
遥相关型
1.
The study shows that the teleconnection pattern called East Asia-Pacific pattern (EAP) plays important roles in the summer rainfall of Shandong.
结果发现:(1)北半球500hPa夏季存在的东亚-太平洋遥相关型(EAP)对山东夏季降水产生重要影响,山东涝年夏季500hPa呈现出EAP型,旱年呈负EAP型。
2.
One point correlation analysis is undertaken for 500hPa geopotential height field in early summer for 1951~1998,with focus on the relationship between teleconnection patterns and China early summer rainfall in 1991~1998.
对1951~1998 年初夏500 hPa 高度场作单点遥相关分析,并重点分析1991~1998 年我国初夏旱涝与遥相关型的关系。
3.
The goal of this study is to determine whether the generation of teleconnection patterns can resultsolely from the internal barotropic processes of the zonally varying climatoloical flow in the northern summer.
本文讨论了夏季纬向不对称气候平均流下通过正压大气内部动力过程建立遥相关型的问题。
5) WA teleconnection pattern
WA遥相关型
1.
Possible way of the effect of WA teleconnection pattern on the early summer monsson over eastern Asia;
北半球冬季WA遥相关型影响东亚初夏季风的可能途径
6) East Asia remote correlation mode
东亚遥相关型
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条