说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 滚动概率
1)  creep probability
滚动概率
2)  movement probability
移动概率
1.
Valuation of movement probability has remained difficult to solve up to now without appropriate solution given to it.
移动概率赋值问题至今没有一个很好的解决方法,现今的放矿仿真使用的移动概率仍然为传统的移动概率赋值方法,并且是始终不变的,已经不能适应现今矿山的仿真要求。
3)  jumping probability
跳动概率
4)  incipient probability
起动概率
1.
The formula for incipient probability of nonuniform sediment containing cohesive particles was established after the arms of force were statistically treated and the probability distribution of instantaneous bottom velocity was assumed.
将促使颗粒运动的外力矩大于颗粒保持静止的外力矩视为泥沙起动的临界力学条件,通过作用力臂的统计处理以反映颗粒在床面排列的随机性,并基于瞬时底流速的概率分布和试验资料建立起适合黏性非均匀沙的起动概率公式。
2.
According to the mechanical condition of incipient motion of the non cohesive uniform sediments and using some results of other researches, the relationship between incipient probability and flow condition is established.
根据无粘性均匀沙起动的力学条件,在已有研究成果基础上,推导出泥沙起动概率与水流条件之间的关系式,得到考虑起动概率的起动切应力及起动流速公式,并将起动条件与起动标准联系分析。
5)  dynamical probability
动态概率
6)  stop probability
止动概率
补充资料:滚动式计划
      使国民经济的中、长期计划具有连续性和稳定性的分段、延续的计划方法。"滚动",比喻计划工作的一种连续程序。这种方法是国民经济计划领域里的一种新的计划方法。
  
  滚动式计划一般有两种形式:①一年一动。指在以年度计划为主的五年(或三年)计划内,头一年的计划作为执行计划比较详细,以后几年的计划只是一个框架。第一年过后,第二年的计划又作为执行计划而得到具体化,并在五年计划后再续编一年的计划框架,这样永远保持一个五年的计划期。其优点是有利于解决生产的连续性与计划的阶段性之间的矛盾,缺点是影响五年计划中年度间的协调性,并且难于区分每个五年的方针和任务。②五年一滚动。指在以五年计划为主的长期计划内(一般是十年或二十年),第一个五年计划规定得比较具体,作为执行计划;其后几个五年计划比较粗,作为预测计划;每过五年修订一次,且续编一个五年计划,使计划永远保持十年或二十年的期限。具体来说,在头一个五年计划执行到第三年时,对执行情况作一次分析和估计,并在此基础上修订和明确下一个五年的基本轮廓;根据下一个五年计划的基本轮廓的要求,指导本五年计划的最后两年的计划工作。这种方法突出了五年计划形式,并使前后两个五年计划较早衔接,不仅使长期计划具有连续性和稳定性,也可以明确每个五年计划的方针和任务。所以现在一些国家倾向采用长期计划五年一滚动的计划方法。苏联在1979年制定的《二十年科学技术进步综合规划》,就是使计划的连续性通过按五年分段滚动的方式来保持。在企业管理中,也可以运用滚动式计划的方法。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条