1) Xiuyan earthquake
岫岩地震
1.
Shear-wave splitting before and after the 1999 Xiuyan earthquake in Liaoning,China;
辽宁1999年M_S5.9岫岩地震的剪切波分裂特征
2.
4 Xiuyan earthquake were analyzed.
运用直接调和分析和速率合成方法对岫岩地震前后烟台形变观测资料进行了处理分析。
3.
3)earthquake occurred on 29 November 1999,this paper shows that obvious variations occurred before and after the Xiuyan earthquake,time delays of slow shear-waves started to increase from about 142 days before the Xiuyan earthquake.
9地震前后进行剪切波分裂分析,结果表明剪切波分裂参数在岫岩地震前后有明显的变化,慢剪切波时间延迟在岫岩地震前约142天开始增加,揭示了震前的应力积累过程。
2) Xiuyan M_S5.4 earthquake
岫岩MS54地震
3) Xiuyan earthquake sequence
岫岩地震序列
1.
Investigation of the 1999 Xiuyan earthquake sequence, Liaoning Province, China;
1999年岫岩地震序列研究
2.
Temporal process of S-Coda Q_c of Xiuyan earthquake sequence in 1999;
1999年岫岩地震序列尾波Q_c的变化过程
4) Xiuyan-Haicheng earthquake M_S5.4
岫岩-海城MS54地震
5) Xiuyan-Haicheng earthquake
岫岩-海城地震
补充资料:川岫
1.山川。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条