说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 相继甩负荷
1)  load successive rejection
相继甩负荷
1.
The influence of layout of water conveyance system on the hydraulic transients of pump-turbines load successive rejection in pumped storage station;
输水系统布置对抽水蓄能电站相继甩负荷水力过渡过程影晌
2)  three phase load shedding
三相甩负荷
1.
Making reference to the Jindongnan-Nanyang-Jingmen UHV AC transmission project,using ATP-EMTP(the electromagnetic Transients Program),the simulation and analysis of power frequency transient over voltage caused by capacity effect in unloaded line,unsymmetrical earth fault and three phase load shedding of series parallel compensated UHV AC power transmission are carried out.
为了研究串并联补偿对特高压交流输电线路电压特性的影响,本文参考晋东南-南阳-荆门1000kV特高压交流试验示范工程,采用电磁暂态计算程序ATP-EMTP对含有串联补偿装置和并联补偿装置的特高压交流输电线路空载线路电容效应、不对称接地故障工频电压升高和无故障三相甩负荷工频电压升高进行了计算分析。
3)  load shedding
甩负荷
1.
A comparison was made between the control of regulating valve and its actual result after load shedding,and suggestions are put forward.
介绍了300 MW无旁路机组甩负荷的试验过程,详述了在DEH组态中关于甩负荷所涉及的逻辑,并对甩负荷后中调门的控制方法和实际效果进行了对比分析及建议。
2.
The paper proposes a new method to determine a viable load shedding scheme to avoid voltage collapse.
在综合分析电力系统电压崩溃事故的基础上,提出了一种新的避免系统电压失稳的甩负荷方案。
4)  load rejection
甩负荷
1.
Numerical method based on internal character for load rejection transient calculation of a bulb turbine installation;
灯泡贯流式水轮机装置甩负荷过渡过程基于内特性解析理论的数值计算方法
2.
Study on the load rejection test of 470t/h CFB boiler;
470t/h大型循环流化床锅炉甩负荷试验研究
3.
The experimental study of flow characteristics and sediment transport in pressure forebay after the load rejection;
甩负荷后压力前池的水流特性及输排沙的试验研究
5)  load-rejection
甩负荷
1.
In the process of load-rejection test of a 300 MW unit,several problems,such as the oscilation of turbine speed governing system,the unit can t maintain no-load operation in a short time,and the temperature of exhaust steam from high-pressure cylinder is more rapidly increasing etc.
介绍了上海汽轮机厂(上汽)无旁路机组甩负荷试验情况,对试验过程进行了分析。
2.
The static load-rejection test is an effective measure to guarantee the speed control of the generation unit in condition of the load-rejection.
机组静态甩负荷试验是保障机组在运行甩负荷工况下,有效控制转速的必要静态调试手段之一。
6)  throwing-off
抛,甩(负荷)
补充资料:电力系统甩负荷过电压


电力系统甩负荷过电压
load rejection overvoltage in electric power system

  由于甩掉负荷和发电机加速旋转而产生的工颇过电压。在长线路传输大功率的悄况下,首端母线电压等于额定电压,而首端发电机的等效电动势E则高于此顿定电压.当由于故障等原因,使线路首端断路器QBI开断后(见图).负荷被甩掉,而原动机调速器和发电机自动调压装置因惯性在一开始起不到调节作用,母线电压就从额定电压上升到E,这是形成甩负荷过电压的第一个因素。此外,由于空载发电机继续受到驱动而加速旋转,汽轮发电机在短时间内的转速可增至原来的1.10~1.15倍,水轮发电机转速可增至原转速的1.3。倍以上,电源电动势和母线电压将按上述同样倍数而继续增大,这是形成甩负荷过电压的另一个因素。 断路器QFI或QFZ分闸后的甩负荷接线图 如果线路末端断路器QFZ首先分闸.由于长线路的电容效应,线路电压进一步升高,同时,由于电源频率随着发电机的转速正比增大.长线路电容效应将更为强烈,使得线路电压升得更高。 甩负荷后,发电机转速和线路电压约在数秒钟内到达最大值,线路最高电压可达额定值的1.5~1.6倍,然后由于原动机调速器和发电机自动调压装里的作用,首端母线电压将逐渐下降到额定值。麟录巍器疑豁。ny飞loadvoltage in eleetrie和wer system)rejeetlon over- 电力系统中
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。