1) long open cementing
长裸眼固井
3) Long open hole drilling
长裸眼钻井
4) open hole completion
裸眼完井
1.
A new skin factor model for open hole completion of horizontal wells under Non-Darcy flow;
非达西流下水平井裸眼完井表皮因子研究
2.
Study of prediction model for sand production in open hole completion;
裸眼完井出砂预测模型研究
3.
Removing technique of oil based mud cake in open hole completion of horizontal well.;
水平井裸眼完井条件下的油基钻井液滤饼解除技术
5) borehole
[英]['bɔ:həʊl] [美]['bɔr'hol]
裸眼井
1.
This paper generalizes and discusses the application of the formation testing techniques in boreholes.
本文对裸眼井地层测试技术在油田中的应用做以归纳论述。
2.
When the acoustic velocity out of a borehole is lower than the acoustic velocity in the borehole,the existence range of real poles is discussed.
以井外流体声波速度小于井内流体声波速度的情况为例,对流体-流体模型裸眼井中声场函数实极点的存在范围进行讨论,计算结果表明只有当轴向波数介于井内流体波数和井外流体波数之间时,声场函数才存在实极点。
6) open hole well
裸眼井
1.
On Critical Techniques and Countermeasures of Measure Pipe Strings for Open Hole Wells;
裸眼井措施管柱关键技术及对策
补充资料:固井
固井
sealing of drop-shaft bottom to rock
gUJ,ng固井(sealing of drop一shaft bottom to roek)在竖井沉井法掘进中将沉井井筒永久固定的技术。当沉井下沉达到设计深度后,为防止井筒继续下沉或出现位移,需采取加强井壁和土帮的固定措施,以隔离井筒与井外含水层的水力联系,这是沉井施工的最后一道工序。固井采取的主要措施是联接套井与沉井的上口,井筒壁后注浆以增加侧面阻力,砌筑沉井基座以增加正面阻力,最终使井筒保持稳固。 在固井之前,若刃脚坐落的基岩上面无隔水粘土层,则需构筑封底止水垫,以防止井内排水后,发生涌砂冒泥或突水事故。封底后,首先要清除套井与沉井之间的泥浆,然后在其中浇灌片石混凝土,同时将沉井上口的钢筋与套井锁口的钢筋焊接好,并浇灌混凝土,使沉井与套井连成整体。最后,排除井内积水,进行壁后注浆。一般采用分段下行、分段内上行式注浆方法。当采用泥浆护壁减阻时,要先注清水,把泥浆置换出来后,再注水泥浆。井底筑有止水垫时,要进行工作面预注浆。待浆液凝固后,破除封底止水垫,在基岩中砌筑沉井基座。待基座砌好,沉井施工结束,即转入井筒普通法掘进。 (石达民)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条