1) exorbitant estimation and calculation
高估冒算
1.
Based on the long-term working experience, some effective measures of preventing the engineering contractor from exorbitant estimation and calculation are put forward.
集多年工作之经验,提出了防止工程承包商高估冒算的几种有效措施。
3) high caved area
高冒
1.
Spontaneous combustion cause and preventing technology at high caved area in soft and extra-thick seam;
松软巨厚煤层高冒区自然发火原因及防治技术
4) predication equation for significant wave height
台风浪波高估算
6) riser calculating
冒口计算
补充资料:高估
1.高价。 2.过高地估计。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条