This paper presents a short-term scheduling MILP model for sequential multipurpose batch plant with single production path based on continuous time domain representation.
基于连续时间描述,在考虑订单的最早生产时间和到期时间的基础上,建立了单生产线序贯多目的批处理过程的短期调度数学模型,模型表达为一个混合整数规划(MILP)问题。
2) multipurpose batch plant
多目的批处理过程
1.
This paper presented a mixed integer linear programming(MILP) mathematic model for periodic scheduling of multipurpose batch plants based on the representation of State Task Network(STN) for process recipes.
基于状态任务网络 ( State Task Network,STN)描述批处理过程 ,提出了多目的批处理过程的混合整数规划 ( Mixed Integer Linear Programming,MILP)周期调度数学模型 。
3) batch processing;system of processing a batch of jobs as a group
成批处理的程序.
5) batch process
批处理过程
1.
Robust scheduling model of batch processes under uncertainty;
一种不确定条件下批处理过程的鲁棒调度模型
6) batch settlement run
多批交收处理程序
补充资料:DEQ 目的港码头交货 (……指定目的港)
%26#8220;目的港码头交货%26#8221;是指卖方在指定的目的港码头将货物交给买方处置,不办理进口清关手续,即完成交货。卖方应承担将货物运至指定的目的港并卸至码头的一切风险和费用。
DEQ术语要求买方办理进口清关手续并在进口时支付一切办理海关手续的费用、关税、税款和其他费用。 这和以前版本相反,以前版本要求卖方办理进口清关手续。
如果当事方希望卖方负担全部或部分进口时交纳的费用,则应在销售合同中明确写明。
只有当货物经由海运、内河运输或多式联运且在目的港码头卸货时,才能使用该术语。但是,如果当事方希望卖方负担将货物从码头运至港口以内或以外的其他点(仓库、终点站、运输站等)的义务时,则应使用DDU或DDP术语。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条