说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 期望值算子
1)  expected value operator
期望值算子
2)  operator-valued mathematical expectation
算子值数学期望
1.
Making use of general Pettis integral,operator-valued mathematical expectation and continuous modified modulus,this paper has deduced the probabilistic approximation and convergent rates about exponentially bounded C-semigroups, which has improved existing results.
借助广义Pettis积分、算子值数学期望、连续修正模等概念,得到了指数有界C半群的概率型逼近式及收敛速度的估计式,改进了已有的结果。
3)  expected oprator
期望算子
4)  expected value of fuzzy variable
模糊变量期望值算子
5)  quantum expectation
量子期望值
1.
Applying HCP to Dirac equations in relativistic realm,for the relativistic free particle or the charged particle moving in a constant magnetic field,it is shown that quantum operators in Dirac theory reduces to the classical quantities in the classical limit and the classical limit of quantum expectation.
计算表明,在经典极限下量子期望值就是对应经典物理量的时间平均值。
6)  Stand deviation principle
期望值计算原理
补充资料:电能不足期望值
      表示电力系统由于机组受迫停运而造成的对用户少供电能的期望值,这一指标能说明故障的严重程度,因为电力系统受限制的因素不仅仅是缺电力,更重要的是发电量的短缺。
  
  计算EENS指标时,一般必须先制订发电机组的停运容量概率表和小时负荷曲线。对某一已知停运容量状态,则每小时不足电量等于不足电力乘以此状态的概率,即EENS=(X-R)×P(X)式中X为停运容量,R为系统备用容量,P(X)为停运容量为X的确切概率。
  
  一年中EENS值可由下式计算:式中P(X)为第i时间段第j天第 k小时停运容量大于等于X的概率,Ci为第i时间段的系统装机容量,L为第i时间段第j天第K小时的负荷,m为一年中时间段,ni为第i时间段中的天数,K为一天中的第K小时。
  
  电能不足期望值综合表达了停电次数、平均持续时间和平均停电功率。
  