说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 优化的rough set综合评价
1)  optimized measurement method based on rough set
优化的rough set综合评价
2)  comprehensive evaluation and optimum seeking
综合评价与优选
3)  the most optimal synthesis evaluation
最优综合评价
4)  Comprehensive Preponderant Evaluation
优势综合评价
5)  comprehensive fuzzy optimization assessment
综合模糊优化评价
1.
Based on the fuzzy comprehensive assessment model, this paper suggests a new comprehensive fuzzy optimization assessment model.
在以往的模糊综合评判理论模型的基础上,提出了新的综合模糊优化评价模型,并把它应用于湖泊、水库水质评价中,以湖泊水质评价为示例演算,有较好的精
6)  comprehensive optimization evaluation model
综合优化评价模型
1.
First,the main factors and evaluating indices were decided based on the deep researches on factors to determine support schemes for foundation pit,and a comprehensive optimization evaluation model was established according to their hierarchy and fuzziness.
首先,在深入研究基坑支护方案确定之影响因素基础上,确定出其主要影响因素及评价指标,并根据影响因素与评价指标的层次性和模糊性特点建立出基坑支护方案确定的综合优化评价模型;其次,针对评价指标取值不确定性特点提出采用区间数表示其属性值的方法,并通过探讨有关区间属性值与区间数权向量确定方法及区间关联分析方法等问题,从而建立出基坑支护方案的区间关联度分析方法;然后,引进相对优势度分析方法,建立出基坑支护方案确定的区间关联模糊优化方法;最后,通过工程实例计算,并与其它分析方法进行对比分析,表明了该方法的可行性与合理性。
补充资料:施工综合进度优化


施工综合进度优化
optimization for overall schedule of construction

shlgong Zonghe jlndU youhuo施工综合进度优化(optimization for overallschedule of eonstruetion)对施工中的相关因素进行多方案比较和优选,找出最佳的进度方案并予以实施的工作。最佳的进度方案应是工期、资源利用、工程造价等方面综合考虑最优的方案。优化的方法包括工期优化法、资源优化法、成本优化法等. 工期优化法在合理利用人力、物力、财力、资源的前提下,尽量缩短关键路径所需的时间。可以采取提高机械化程度等先进施工方法,以及采用近饱和密度的施工组织措施等.近饱和密度的施工,是按流水施工的原理确定工艺参数、空间参数和时间参数,使多工种、多工序相互穿插,紧密衔接,充分利用施工场地,尽量减少施工中的停歇时间,以加快施工进度。 资源优化法在力求减少资源投人的条件下满足工期要求。有两种优化方法:①资源已定,力求工期最短;②工期已定,力求资源投人最少。 成本优化法寻找工程总成本(或工程总造价)最低的最短工期。具体方法是:将工程的直接费(随工期压缩所需增加的机械购置和使用费用、材料费用、临建费等)与工期延长所需增大的间接费进行比较,并计算工程提前投产后的发电效益等诸多因素。优化的结果,使工程成本最低,工期最短。