说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 递阶随机生产计划
1)  hierarchical stochastic production planning
递阶随机生产计划
1.
The paper explores the problem of optimal hierarchical stochastic production planning and control in agile manufacturing workshops (AMW).
研究了敏捷制造车间 ( AMW)中的最优递阶随机生产计划与控制问题 。
2)  hierarchical production planning
递阶生产计划
1.
On the basis of studying the existent models of hierarchical production planning and control,the authors propose that the interaction/prediction approach should be used to solve the problems of optimum hierarchical production planning and control of the Flexible Automation Workshops (FAW).
本文在研究现有多种递阶生产计划和控制模型的基础上,提出用关联预测法来解决柔性自动化车间(FAW)的最优递阶生产计划与控制问题,文中首先建立FAW生产控制的数学模型,然后推导FAW递阶生产计划的关联预测算法,编写了基于该算法的IPA软件包并进行了算例研究,同现有的计划分解方法相比,这里的方法更适于将CIMS/MRPⅡ下达给FAW的中期计划最优分解成由FAW中各FMS执行的短期计划。
2.
In this paper,a hierarchical production planning(HPP) model is developed to solve a production planning and scheduling problem in complex manufacturing systems with multiple constraints.
应用递阶生产计划(HPP)模型研究多约束条件下复杂制造系统的生产计划与调度问题,通过引入三层递阶结构建立按时间和产品大类分解的多目标生产计划模型,针对制造系统生产计划的特点提出了生产作业管理的研究思路。
3)  stochastic production planning
随机生产计划
1.
The paper addresses the problem of the optimal stochastic production planning in flexible automation workshops(FAW),each with a number of flexible manufacturing systems (FMS).
研究了由多个柔性制造系统组成的柔性自动化车间的最优随机生产计划问题。
4)  Hierarchical system of production plan
计划递阶体系
5)  stochastic production
随机生产
1.
Optimal production policy for deteriorating items with backlogging demand in stochastic production process;
随机生产中拖后需求的变质产品最优生产策略
2.
The production characteristics of deteriorating items under constant,linear and exponent stochastic production states is analyzed,and total cost functions of these stochastic EPQ models based on time-varying demand rate is obtained.
分析了常数型、线形型和指数型三种随机生产状态下易变质产品的生产特性,得到了基于时变需求的三种随机EPQ模型的总成本函数,提出了确定生产时长的最优生产策略算法,最后给出了算例对上述算法进行了验证。
6)  production schedule
生产计划
1.
ARMA-BP model for optimizing master production schedule in process enterprises;
流程型企业主生产计划优化的ARMA-BP模型
2.
Limited-capacity scheduling method in making production schedules;
生产计划编制的有限能力计划法
3.
Control Study about the Production Schedule on the Basis of the Fuzzy Theory;
基于模糊理论的生产计划的控制研究
补充资料:大系统递阶控制
分子式:
CAS号:

性质:从设计角度讲是指以分解-协调原理对动态大系统实行多级优化。它将整体大规模优化问题通过参数分解或结构分解转化为一些相互关联的子问题。上级子问题通过协调变量规定下级子问题的内容,使之成为易于求解的简单问题或小规模问题,解得的结果反馈到上级子问题中,按一定的准则改进协调变量,如此反复迭代,最后趋于整体优化。从实施角度讲是指采用局部控制器和全局控制器对动态大系统实行多级控制。在更广泛的意义上,则是指对大系统实现从基础控制、多变量优化控制、稳态优化、作业调度到生产计划与管理的多级控制与管理系统。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条