1) grey engineering
灰色工程
2) grey-model
灰色方程
3) grey process
灰色过程
1.
The concept of a non-equal time-interval grey model is adduced in this paper,accomplishing a tending in time order requirement,discussing the modelingmethod and equation of the non-equal time-interval grey model,providing a toolfor describing the non-equal time-interval grey process or solving some engineeringproblems.
本文提出了非等间隔灰色过程的概念,实现了对灰色模型GM在时序要求上的拓展,探讨了非等间隔灰色模型的建模方法和模型方程,为描述时间序列间隔不等的灰色过程和解决工程上的问题提供了一个新的工具。
4) plastering engineering
抹灰工程
1.
Common quality failings of plastering engineering and its prevention measures;
抹灰工程的质量通病及防治措施
2.
The application of polypropylene fiber in plastering engineering;
聚丙烯纤维在抹灰工程中的应用
3.
According to the construction features and specification of mason work,concrete engineering and plastering engineering measures are proposed for winter construction in order to ensure construction quality in winter.
介绍了冬期施工的概念及冬季施工特点,论述了砖石砌筑工程、混凝土工程、抹灰工程等主体阶段工程的冬施措施,并对其施工特点、施工要求作了交代,以保证冬季工程施工质量。
5) Ash Dam Engeering
灰坝工程
6) Ash yard project
灰场工程
1.
Ash yard project is an indispensable part before generating electricity,and its progress delay has a direct influence on trial operation of thermal power projects.
灰场工程是火电厂发电不可或缺的一部分,其进度延误就直接影响火电工程试运行的进行。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条