4) multiparty participation
多方参与
1.
To meet the security requirement of special systems as e-cash and e-bidding,a secure blind signature scheme of system center control and multiparty participation is designed on study and analysis of elliptic curve public key cryptosystem,self-certified public keys,bit commitment protocol and Nyberg-Rueppel signature scheme,and its validity and security are analyzed and verified.
为了满足电子现金、电子招投标等特殊系统的安全性需求,在研究分析椭圆曲线密码、自认证公钥、位委托协议和Nyberg-Rueppel签名方案的基础上,设计了一种系统中心控制和多方参与的安全盲签名方案,并对该方案的正确性、安全性进行了必要分析和证明。
6) participatory approach
参与式方法
1.
Application of participatory approach to the small watershed management
参与式方法在小流域治理中的应用
2.
The paper introduces the general steps and methods of using the participatory approach in the comprehensive control planning design by taking Wangmo county as an example.
以望谟县为例,分析在喀斯特石漠化综合防治规划设计中运用参与式方法的一般步骤和方法。
3.
In our case study, we integrated the participatory approach that had been adopted and introduced in international development practice.
把当前国际发展领域通用的参与式方法与生态规划方法相结合,通过多层次、多学科、多部门的共同参与,使外来者的技术和当地相关利益群体的经验比较好地融合,完成村民参与式的生态环境恢复与保护规划。
补充资料:项目参与方
项目参与方
2.项目贷款人主要有三部分,分别贷人美元和人民币。第一部分由日本输出人银行和由三菱银行牵头的日本各商业银行借人;第二部分为美元商贷,由中国银行属下的中国建设财务(香港)有限公司和汇丰银行属下的D财务公司牵头的香港国际银团借人;第三部分为人民币贷款,来源为省内。 3.项目承建商为日本三菱公司。 4.项目设备供应商为日本三菱公司。 5.项目经营方为省电力集团。 6.项目电力购买方为省电力集团。 7.项目融资抵押代理行为D财务公司国内代理行为中国建设银行省分行。 项目各参与方的关系可以用下图表示。中方(两家)港方(二家)VY由厂顶日助带鑫亏古阑录[项目参与方】项目发起方为省电力集团和经济特区电力开发公司,其余各方为: 1.项{」借款人为项目公司,即某省YY发电厂合作公司。股东有中、港两方。中方投资者有省电力集团和经济特区电力开发公司;港方有《_且集团、CZ集团和C3集团公司
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条