1) communication support facilities
通信配套设备
2) equipment coordination
设备配套
1.
Dimensions of roadway and open-off cut were confirmed with reasonable equipment coordination of coal cutter,scraper and hydraulic supports in full-mechanized caving mining face.
0Mt高产高效的要求,为今后国内高产高效工作面设备配套与巷道、切眼尺寸的确定提供借鉴。
2.
This paper summarizes the different modes and methods of equipment coordination in inclined shaft construction, and proposes some views on the working line and the way of rapid construction of inclined shafts.
本文总结和分析了各种斜井施工设备配套的方式、方法,对斜井快速施工作业线配套和作业方式提出了一些看法。
3.
This paper introduced the development process and application condition of the inclined shaft construction technology, emphatically described the characteristics and techniques of equipment coordination, and the methods of drilling, blasting, and shaft water control.
文章介绍了斜井施工技术的发展过程和应用情况,结合中煤第一建设公司斜井施工实例重点介绍了机械化设备配套的特点、工艺原理以及凿岩、爆破、井筒治水的方法,指出了设备配套、效率及进度等方面存在的问题。
3) matching equipment
配套设备
1.
Then the design and characteristic of the hydraulic support and critical parts are introduced,at the same time,presents the main technical parameters and corresponding matching equipment is presented.
并介绍了支架及其各主要结构件的设计和特点,同时给出了支架的主要技术参数和相应的配套设备。
4) supplementary equipment
配套设备
1.
It is suggested that the leader should take the initiative to grasp not only the overall design and the supplementary equipment construction, but the civil engineering technological design and the layout of metrology standard equipment.
阐述了在医院建立医学计量三级站的目的、意义及主要作用;围绕如何建立三级站,介绍了建设过程中领导带头,把握整体设计与配套设备建设以及土建工艺设计与计量标准装置布局等环节的要求;论述了建站的一般步骤。
5) machinery matching
设备配套
1.
The article mainly introduces the key technology in machinery matching for the construction of bituminous concrete pavement of highways and the results of application in the pavement construction of Contract No.
主要介绍了高等级沥青混凝土路面机械化施工中在设备配套方面的一些关键技术及在杭金衢高速公路四合同段路面工程施工中的运用效果。
6) equipment matching
设备配套
1.
Taking a large-scale earth/rock engineering works in Shenzhen as an example,the paper presents the calculation method for the equipment matching of an earth/rock engineering works.
根据深圳大型土石方工程的内容介绍了土石方工程的设备配套计算方法。
2.
In this paper, the equipment matching and key technology in fully mechanized top coal caving face of 6 Mt was introduced briefly and the technology to control the top coal caving by electro-hydraulic system was given in detail.
简要介绍了600万t综放工作面设备配套情况和关键技术,重点阐述了电液控制放顶煤工艺过程,预计工作面年产可达到650万t,直接工效可达到350t。
补充资料:气流输送的配套设备
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条