1) dynamic risk estimation
动态风险估测
1.
It studies comprehensive dynamic risk estimation for capital venture involving multi-stages and multi-stakeholders.
为了解决高新技术产业风险投资过程中涉及多阶段、多因素、多主体的动态风险估测困难问题,根据模糊数学评价原理构造了多阶段多层次风险综合估测模型。
3) risk estimation
风险估测
1.
This paper describes a dynamic risk estimation model in information system development based on fuzzy mathematics theory and its application.
根据模糊数学的理论建立了一种信息系统开发的动态风险估测算法以及该算法在信息系统开发的风险估测中的应用 。
4) temperature risk dynamic assessment model
温度风险动态评估模型
5) dynamic risk
动态风险
1.
Study on dynamic risk measurement based on G JR and EVT;
基于GJR模型的EVT动态风险测度研究
2.
Finally,the relation of"risk factor-monitoring items-risk accident"is used as a main line to develop the dynamic risk database based on monitoring data through the basic flow of database,and the database can support the dynamic risk management software with data.
文中以风险因素——监测项目——风险事故为主线,利用数据库系统构建了基于监测信息的动态风险数据库,从而为盾构隧道施工动态风险管理软件提供基础数据支持。
3.
And then according to the calculation principle of the risk factors’ infection,dynamic risk anal.
基于PERT网络模型,以网络活动为基础,对所有活动进行风险因素识别,并考虑其风险因素的时空变化性及其施工性质,对风险因素进行概率分布量化及活动影响权重量化;然后,依据量化结果,进行网络时间参数计算、Monte Carlo Simulation(MCS)模拟分析,得到项目完工工期的概率分布;最后,依据项目影响性计算原则,对各风险因素进行动态风险分析,得出各风险因素的影响指数曲线,达到进度动态风险分析的目的。
6) dynamic coherent risk measure
动态相关风险测度
补充资料:风险估测
风险估测
【风险估测】运用概率及数理统计方法估测某一风险发生的概率及其损失后果的频率、性质和概率,以准确地估计损失的严重后果。或者说,风险估测就是运用概率统计方法对风险事件发生和风险事件的后果加以估测,从而给出一个较准确的概衣水平。风险估测包括对风险书件发生频率的估测和损失严重程度的估测。风险估测的具体内容有:第一,估测风险事件在确定时间内如一年(月、周)内发生的可能性即频率的大小;第二,根据风险事件发生的数量和损失的严重程度估计总损失额的大小。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条