1) Luobajie gully
罗坝街沟
3) curb and gutter
缘石街沟
1.
This paper, according to data of the hydraulic model experiments, testes and verifies the suitability of Chezy-Manning formula for calculating drainability of curb and gutter while the depth of water is very small.
本文根据实验资料验证了在水深很小情况下,计算路面缘石街沟泄流量时谢才—曼宁公式的适用性;并根据实验资料对高等级公路路面排水中的缘石开洞截流入水口在各种情况下截流量大小进行了分析和研究,建立了截流量与主要影响因素间的定量关系。
4) street drain
街道边沟
5) Donggouba
东沟坝
1.
The characteristics of exhalation-sedimentary deposit of Donggouba polymetal deposit: evidence from ore s REE composition.;
东沟坝多金属矿床喷流沉积成矿特征的稀土元素地球化学示踪
2.
REE geochemistry method has been used to trace the resources of the oreforming materials in the Donggouba polymetallic deposit.
对东沟坝矿床矿石及赋矿火山岩的稀土组成研究表明:矿石普遍发育显著的Eu正异常和弱的Ce负异常,说明成矿热液为温度较高(250℃以上)、相对还原的热流体。
3.
The Donggouba area lies on the north rim of "Mian-Lue-Yang trigonalgeological zone" in southern Shanxi.
东沟坝地区位于陕南“勉略阳三角地带”北缘。
补充资料:罗贡坝
罗贡坝 世界上最高的坝。位于塔吉克斯坦瓦赫什河上、努列克坝上游70千米,是该河最上一个梯级,具有灌溉和发电等综合效益。水库总库容130亿立方米。坝址基岩为砂岩、粉砂岩和泥板岩,地震烈度9度。粘土斜心墙土石坝,最大坝高335米,坝顶长660米 ,顶宽20米,底宽1500米,坝体体积7550万立方米。右岸设有表面进口与深式进水口合一的泄水隧洞,泄洪能力5750立方米/秒 ;地下厂房在左岸,装机6台,共360万千瓦。此外,为保护坝基岩层免遭冲蚀,在坝体上游地基内采取了综合防冲蚀措施,心墙底喷混凝土,下设灌浆帷幕并进行固结灌浆。工程于1975年开工,大坝于1989年建成。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条