1) retardation metrical system
延迟量测量系统
3) measurement of time delay
延迟量测量
4) Cable delay measurement test
线延迟测量
5) phase retardation measurement
相位延迟测量
6) retardation
[英][,ri:tɑ:'deiʃən] [美][,ritɑr'deʃən]
延迟量
1.
The method of correcting the retardation deviation of a wave-plate through geometrical optics is studied.
通过研究晶体延迟器件光线入射方向与其延迟量变化的关系,从理论上导出了光线斜入射到波片时波片相位延迟量变化的计算公式,从而证明了可以通过绕与波片光轴平行的轴向或绕垂直于波片光轴的轴向转动波片进行波片延迟误差的校正。
2.
Acording to the Jones matrix,the intelligent system for measuring retardation of wave plate has been designed and established and the automatic processing of the data was realized,based on the polarization modulation and use of advanced Si detector,lock-in amplifier and advanced microprocessor technology.
基于偏振调制原理,从琼斯矩阵理论出发,利用先进的Si探测器、锁相放大器和微处理器,设计并建立了一套测量相位延迟器延迟量的智能化测量系统,实现了数据的自动化处理。
3.
So it is important to determinate the retardation of the wave plate.
利用椭偏测量术中的相位调制椭偏测量原理测量了1/4波片的延迟量。
补充资料:采剥量验收测量
采剥量验收测量
acceptance surveying of excavated volume
eo一bol一ang yanshou eel一ong采剥t验收测t(aeeeptanee surveying。f ex-Cavated volume)定期测量并计算采剥矿岩体积的工作。一般每月测量一次作业台阶的采剥进度线,内容包括测量台阶平台上的结存矿和岩堆,绘制台阶采剥验收平面图,并据此计算采剥矿岩体积。一些国家在露天矿山采用地面立体摄影和航空摄影测量,中国的一些露天矿也研究用地面立体摄影测量作采剥量验收方法。 测量方法要根据露天矿具体条件和采用的工作控制网来选择,一般有经纬仪视距测记法、交会法和摄影测量法等。中国大多数露天矿都使用经纬仪视距测记法,这种方法与其他两种方法相比,其优点是携带的仪器少、外业时间短.适用于任何形状采区、任何开采深度和任何工作控制网。视距测量使用的仪器,其精度应不低于.JI:级。测量时,直接在工作控制点安置仪器,按极坐标法测定坡顶、坡底线上的特征点。特殊情况下可由工作控制点引出一个视距导线支点,边长应不超过80m。采用断面线法布设工作控制网时,采剥量验收用两台经纬仪交会(见图):一台经纬仪安置在CC‘断面线一端的基点c上,标定断面线方向并测量断面线上坡顶点、坡底点及其余特征点的竖直角占,;另一台经纬仪安置在间隔2一3条断面线的基点F上,测量基线BF与各特征点间的水平角月,,分别按下式计算各特征点距基点C的水平距离d、一ltan夕.和对c点的高差h一ditan占,式中l为安置经纬仪的两基点间的水平距,m。 采剥量体积计算方法有垂直断面法和水平截面法两种。 (1)垂直断面法在采剥验收断面图(或由采剥验收平面图,按规定间隔的断面线位置转绘的断面图)上,量出各断面月初与月末进度所圈定的图形面积S,,则两断面间的体积 5.+S_,. V,~一乙 2落 断面线法当S、与S+1面积相差40%以上时 v一音(S+S】一+丫5 15,一,式中1.为相邻两断面间距离,m。 (2)水平截面法在采剥验收平面图上,分别量出月初、月末坡顶线和坡底线所圈定的图形面积S上和S下,则两水平截面间的体积 S卜+S下. V一二只三二-二二上h 2式中h为台阶平均高,m。 采剥矿岩量等于体积乘以相应的容重。月采剥矿岩量则需加上本月验收后到月末的统计量,减去上月验收后到上月末的统计量。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条