1) ISAS(integrated service access system)
综合业务接入系统
2) multiservice integrated access system
多业务综合接入系统
1.
Based on the in-depth research of multiservice integrated access system for group mobile informalization,the plan and design on multiservice integrated access system for group mobile informalization in the future is proposed.
文章就集团移动信息化多业务综合接入系统进行了深入地研究,并提出了今后集团移动信息化多业务综合接入系统的规划和设计方案。
3) integrated services access network
综合业务接入网
1.
In this paper, the features of functions and netting organization methods of the integrated services access network are mainly discussed.
文章主要阐述综合业务接入网的功能特点及组网方式,提出运用综合业务接入网的技术来组建高速公路通信系统的观点。
4) optical multi service access
光综合业务接入
1.
A solution about the optical multi service access system in JINCHAO highways;
锦朝高速公路光综合业务接入系统解决方案
补充资料:发电厂接入系统设计
发电厂接入系统设计
planning of connecting power plant to system
fod一onehong 11eru xltong shel,发电厂接入系统设计(planning of eonnectingpower plant to system)论证发电厂接人系统的方案,确定与该发电厂配套的送出工程项目的系统专题设计。电力系统中期发展规划所提出的结论,可以作为发电工程的设计依据。但电力系统不断在发展,有关工程的建设进度也常有变化,因此在进行发电厂设计时,还应进行发电厂接入系统设计,以便根据当时实际情况,对有关设计方案进行校核和调整,作为编制电力建设计划及设计任务书的基础。发电、翰电及变电是一个整体,安排发电工程项目的同时要安排好配套的输电线、变电所和相应的系统继电保护、安全自动装置、调度自动化及系统通信的建设项目,统称之为发电厂送出工程。因此发电厂接人系统设计包括接人系统电力网方案设计、接人系统继电保护设计、接人系统安全自动装置设计、接人系统调度自动化设计及接人系统通信设计等5个方面。 接入系统电力网方案设计研究所设计的发电厂与电力系统的关系,分析该发电厂在电力系统中的地位及作用,确定发电厂的送电范围、出线电压等级及回路数、与电力网的连接方案等,并对发电厂电气主接线、与电力网有关的电气设备参数、发电厂运行方式等提出技术要求。其目的是为编制发电厂送出工程设计任务书提供依据,为发电厂初步设计准备条件。发电厂接人系统设计涉及的地域范围及设计重点要依据发电厂的特点而定。如为系统主力发电厂则重点研究与系统主网架有关的问题;大型水电厂则应研究扩大电力系统以充分发挥水电效益的问题;地区中小型发电厂则研究与地区电力网的关系问题。接入系统电力网方案设计的重点是电力电量平衡、接人系统方案论证及有关的电气计算。 (l)电力市场需求预测。在中国,根据有关政府部门的国民经济发展战略及目标,在审定的电力系统长期发展规划、电力系统设计等工作的基础上,提出符合《电力发展规划编制原则》及其他有关规定的负荷水平及负荷特性分析意见,对该发电厂近区负荷预测进行详细的分析工作。 (2)电力电量平衡。主要目的是:①确定所设计的发电厂的工作容量及备用容量,校核该厂的装机容量及建设进度;②研究水电厂装机容量及可发电量的利用程度,若未获充分利用则应研究扩大电力网、设置季节性用户或是减少装机容量的必要性及合理性;③确定火电厂的设备年利用小时数作为设计该厂的依据。(见电力系统电力平衡和电力系统电量平衡) (3)接人系统方案论证。根据系统运行方式分析发电厂与电力系统的功率交换情况,并根据发电厂所在电力系统的特点、发电厂所处位置,提出发电厂接人系统方案。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条