1) Nortel networks
北电网络
1.
This paper introduces the network structure and core components of Nortel networks NGN solution.
本文介绍了北电网络基于IMS的NGN解决方案的网络结构和核心部件,并对该方案的组网能力与业务应用进行了分析。
2) network
[英]['netwɜ:k] [美]['nɛt'wɝk]
电网,网络
3) Hubei electric power network
湖北电网
1.
The Organization and process about the first time combined anti accident maneuver of Hubei electric power network was introduced.
介绍湖北电网首次联合反事故演习组织情况及演习过程 ;对演习中所取得的经验和所存在的不足进行分析和总
4) North China Power Grid
华北电网
1.
Study on Forecast Method of the Sales of Electric Energy of North China Power Grid;
华北电网售电量的预测方法研究
2.
Research on Improving Transfer Capability of 500kV Lines in North China Power Grid by Adopting Compact Transmission Technology;
采用紧凑型技术提高华北电网500kV线路输送能力的研究
3.
Brief Analysis on Tripping Incident of Transmission Line Directly Under North China Power Grid in 2008
2008年华北电网直属输电线路跳闸浅析
5) Hubei power grid
湖北电网
1.
Development and prospect for the Hubei Power Grid Dispatching Automation;
湖北电网调度自动化系统的发展与展望
2.
Experiences and Lessons in the Safe and Stable Operation of Hubei Power Grid;
湖北电网安全稳定运行的经验和教训
3.
Suggestions About Hubei Power Grid 1999~2010 Main Network Construction;
湖北电网1999~2010年主网建设几点设想
6) Northwest China power grid
西北电网
1.
The actually measured excitation system models and their parameters are led into annual power network stability calculation of Northwest China power grid in the year of 2007.
在2007年度西北电网稳定计算中,引入实测励磁系统模型和参数。
补充资料:厂用电受电
厂用电受电
energizing of auxiliary power system
chongyongd一on sho一Jd一on厂用电受电(energizing of auxiliary powersystem)机组附属设备安装完毕后需通电试运行,所需厂用电源由外部供给,因此厂用电受电是调试工作开始的标志。 受电步骤新建电厂先由电力系统向变电站供电,再依次对高压起动/备用变压器、3~10kv厂用配电装置、厂用工作变压器及380V配电装置供电。扩建电厂因高压起动/备用变压器已经投人运行,故可利用它的电源对扩建的厂用配电装置等供电。 调试项目主要有:①用额定电压依次对空载线路、变电站母线、隔离开关、断瘩器、互感器、变压器及厂用配电装置等进行冲击合闸试验。有条件时.冲击合闸前应先进行递升加压试验。升压过程中注意检查各设备有无放电声及短路现象,发现问题及时处理后再进行升压。②检查三相电压应平衡,相序应正确,各段母线的相位彼此应一致。对配电装置供电时,有时会由于母线电容和与母线连接的电磁式电压互感器的电感相互作用而出现铁磁谐振,此时相电压升高,中性点明显位移。为消除谐振可在电压互感器的剩余电压绕组处并联电阻以去振。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条