1)  ULN2003
ULN2003
2)  UL
UL
1.
UL Laboratory Constructuction of Electric Motor-operated Tools;
电动工具UL实验室的建设
2.
The security of these ballasts must be complied with UL935,the electromagnetic interference complied with USFCC 47 CFR 18,and the specification complied with ANSI C82.
由于美国和北美地区使用的电网、荧光灯管、灯管预热方法与欧洲和国内的有很大的差异,因此对于在该地区使用的荧光灯电子镇流器的要求与欧洲和国内的有很大的不同,其安全性必须符合UL935的要求,电磁兼容性必须符合FCC第47号法规第18章的要求,性能应符合ANSI C82。
3)  U.L
U.L.法
4)  408UL
408 UL
5)  UL method
UL法
6)  UL standard
UL标准
1.
At present,there is a great difference between UL and GB(Chinese National Standard) systems due to national difference in law,code and practice,which makes UL standard appliance wiring material fail to pass 3C testing.
目前针对电线电缆的检测,由于国家法律、法规和惯例的不同,国家标准(GB)和UL标准存在较大差异,难以协调一致,存在符合UL标准的电器布线不能满足3C检测的情况。
2.
It is found in daily inspection and supervision of inspection and quarantine that low-voltage electrical apparatuses production enterprises are in little knowledge of the differences between IEC and UL standards, thus it will bring risks for the export product.
分析了低压电器IEC和UL标准间的一些差异所在,如标准要求的泄漏电流测试仪器不一样,标准中II类和2类电器的定义和接地的术语标示不同,电动产品的额定值标示有所区别,塑料材料检测的试验方法和要求等差异。
参考词条
补充资料:JF2003三层筛操作规程
1、遵守《铸造设备通用操作规程》有关规定。
2、工作前,检查三角皮带的松紧度和磨损情况,如过紧过松或磨损严重,应予更换或调整。
3、工作前,检查筛网是否磨坏,吊杆是否紧固。如筛网磨坏或吊杆松动,应通知维修人员处理。
4、工作前,先点动试车,然后空运转2-3分钟,检查电动机、三角皮带和筛子的运动是否正常,确认一切正常后,方可进行生产。
5、设备运转正常后,方可加料,筛网上不许放料过多,以免超负荷使用。
6、工作后,筛面上不许存放砂子或其它物件。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。