1) damage analysis
战损分析
2) battle damage
战损
1.
According to engineering practice, the reasonable one is selected from results which was trained by rough algorithm in different order as finally battle damage rules.
对比按条件属性不同顺序对战损规则训练的结果,根据工程实践,从中选择一个更为合理的作为最终的战损决策规则。
2.
In the first and third phases, spares are allocated based on the availability with the method of Monte-Carlo simulation, while in the second phase based on the battle damage probability.
根据舰船机电设备在典型任务剖面内的航渡、作战和撤离返航三个阶段不同故障特点,建立了任务周期内新的备件配置模型:航渡和撤离返航两个阶段利用以可用度为中心的Monte-Carlo仿真方法进行备件配置;作战阶段根据战损情况进行备件配置;系统总的备件配置数量等于三个阶段备件配置数量的和。
3) probability of combat damage
战损概率
4) battlefield damage assessment
战损评估
1.
To develop the equipment battlefield damage assessment decision support system,the method of equipment battlefield damage level assessment is researched.
为建立装备战损评估决策支持系统的需要,对装备战损等级评定方法进行了研究。
5) war damage quantity
战损量
6) battlefield damage simulation
战损模拟
1.
In order to improve the efficiency of equipment battlefield damage simulation,an analytic model of battlefield damage is constructed based on Monte Carlo method.
为了提高装备战损模拟的效率,以蒙特卡洛方法为基础,构建了关于装备战损的解析模型。
参考词条
补充资料:扣损余额全损
扣损余额全损
【扣损余额全损]财产保险理赔业务常用术语。从保险标的全损额中扣除出售损余物资所得加上出售及检验费用后的全部净损失额。保险人负责赔付保险金额与出售损余物资所得款项扣除出售费用和检验费用之后的差额。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。