1) coping temperature
碹顶温度
1.
After analyzing the structure and characteristic of float glass melting furnace, and the regular controlscheme of coping temperature, this paper presents a generalized predictive controlalgorithmwith stair-likecontrolscheme.
在分析浮法玻璃熔窑的结构及其特点和熔窑碹顶温度常规控制方法的基础上,采用阶梯式控制策略,实现了浮法玻璃熔窑碹顶温度的广义预测控制,并给出了广义预测控制工程实现和控制效果。
2) spring,of arch
碹(拱)顶高度
3) Arch
[英][ɑ:tʃ] [美][ɑrtʃ]
碹顶
1.
The Study on the Wear Mechanism of Silica Brick Used in the Arch of Glass Melting Furnace and the Development of a High Quality Silica Brick;
玻璃窑用碹顶硅砖的损毁机理研究及优质硅砖的研制
4) crown tie rod
碹顶拉条
1.
Testing of the tension in the crown tie rod can provide early evidence of damage to the furnace crown.
玻璃池炉碹顶拉条的张力检测具有重要的实用价值。
2.
A new developed crown tie rod tension te.
基于振动频率法开发的碹顶拉条张力测试系统可以对碹顶侵蚀程度进行评估,也可以给拉条的张力调整提供准确度量,保障碹顶安全。
5) rise,of a crown
碹(拱)顶高
6) high-crown
高碹顶
1.
The three-dimensional mathematical model of oxy-fuel combustion space in high-crown glass furnace in the combustion process was established.
以优化玻璃熔窑结构,提高全氧燃烧玻璃熔窑寿命为目的,建立了高碹顶玻璃熔窑全氧燃烧火焰空间中燃烧过程的三维数学模型。
补充资料:铂电阻温度表(见电阻温度表)
铂电阻温度表(见电阻温度表)
表。bod旧nZu wendubiao铂电阻温度表见电阻温
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条