1) Basic automation level
基础自动化级
2) first-level base automation
一级基础自动化
1.
The first-level base automation control and the second-level process control of the automation system for 400 m2 sintering machine were emphasized.
重点介绍了400 m2烧结机自动化系统的一级基础自动化控制部分和二级过程控制部分,并对各级控制的组成及功能进行了详细的说明。
3) L1 Basic Automation Level
L1基础自动化级
4) basic automation
基础自动化
1.
Design concept on basic automation system for BOF of No 2 SteelmakingPlant of Xiangtan Iron and Steel Corporation;
湘钢第二炼钢厂转炉区基础自动化系统设计思路
2.
Transformation of computer supervisory and control system and basic automation of Baishan Cascade Hydro Station;
白山梯级水电厂监控系统及基础自动化改造
3.
Present status and perspective of basic automation of rural hydroplants in China;
我国农村水电厂基础自动化的现状和展望
6) Level 1 basic automation control system
L1级基础自动化控制系统
补充资料:后勤指挥自动化系统(见后勤指挥自动化)
后勤指挥自动化系统(见后勤指挥自动化)
automated system of logistic command
houqin zhihui zidonghua xitong后勤指挥自动化系统(automated、ys-tem of logistie eommand)见后勤指挥自动化。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条