1) the point of load
负载点
1.
In result,the point of load untested can not be modified correctly and the point of load at the0.
针对电能表检验装置在检定中存在的问题:检定负载点太少造成空白点而无法修正;功率因数0。
2) Point-Of-Load converter
负载点电源
3) High LoadPoint Test
高负载点试验
4) Zero power loading point
零功率负载点
1.
This paper mainly discusses the two operating points for the test of synchronous machines,no-load point and zero power loading point.
本文主要对同步电机试验中的空载点和零功率负载点两个特殊工作点的运行工况进行了分析 。
5) immobilization
负载
1.
Advances in studies on the kinetics and technology of immobilization of TiO_2 photocatalyst film;
TiO_2光催化膜负载机理和技术研究进展
2.
Study on immobilization technology of nanosized titanium dioxide photocatalyst;
纳米TiO_2光催化剂负载技术研究
3.
Study of Modification with Doping and Immobilization of Nanometer Titanium Dioxide Photocatalyst;
纳米TiO_2光催化剂掺杂改性与负载的研究
6) supported
负载
1.
Preparation and Characterization of Ni Catalysts Supported on Organized Mesoporous Alumina;
负载Ni金属有序介孔氧化铝催化剂的制备及表征
2.
Catalytic synthesis of benzyl acetate by supported heteropolyacid PW_(12)/C;
活性炭负载磷钨酸催化合成乙酸苄酯
3.
Research of diatomite-supported iron-based late transition metal catalyst;
焙烧温度和盐酸浓度对硅藻土负载铁系后过渡金属催化剂的影响
参考词条
补充资料:闭式单点、双点压力机
| |||||||
主要参数内容 | 国际先进 | 国内先进 | 国内一般 | 国内落后 | 评定方法及说明 | ||
(一)加工精度 | 参照GB10924-89、GB10933-89、JB5200-91 | ||||||
1、滑块下平面对工作台上平面的平行度(mm) | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.02+0.10/100×滑块下平面的被测长度 | |||||||
2、滑块行程对工作台上平面的垂直度 | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.05+0.02/100×滑块行程长度 | |||||||
(二)结构性能 | |||||||
1、离合器、制动器接通率,当滑块行程次数≤16次/分时为70%,≤25次/分时为60%,≤45次/分时为50% | 大于规定值10% | 大于规定值 | 达到规定值 | 达不到规定值 | |||
2、液压超负荷保险装置、微调装置、吨位指示器 | 全部具有 | 全部具有 | 部分具有 | 没有 | |||
(三)噪声dB(A) | |||||||
1、公称力≤400kN | ≤85 | ≤87 | ≤88 | >88 | |||
2、公称力>400kN | ≤87 | ≤88 | ≤90 | >90 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。