1) pile section
桩节
1.
It is necessary to prefabricate hollow pile sections and the conductor casing for the construction of 3 to 4.
4m空心桩,需要预制空心桩节和护筒、搭建水上平台,进而介绍了钻孔施工、桩节组拼以及压浆等工艺。
2) recasting pile unitin jecting
预制桩节
3) bamboo joint pile
竹节桩
1.
The application of bamboo joint pile in tall buildings;
竹节桩在设计院科普楼工程中的应用
4) stump height
留桩节位
1.
The orthogonal experiment design of four factors and three levels was adopted to study the effects of ratoon stump height of the parents and application of GA and urea on hybrid seed production from ratooning rice plants.
采取四因素三水平正交试验研究亲本留桩节位、“92 0”和肥料对杂交水稻再生制种产量的影响 ,结果表明 :影响最大的是母本留桩节位 ,其次为父本留桩节位 ,再次为尿素用量 ,“92 0”影响最小。
5) precast nodular pile
预制节桩
1.
This paper introduces the basic shapes of the nodular pile,summarizes two cast-in-site tests which have been done in Tianjin soft clay and one model test for precast nodular pile in sand soil,and analyzes some test curves,and sums up the researches on the bearing mechanisms of nodular pile made in the three tests.
给出了节桩的基本形状,简要概括了有关预制节桩在天津软黏土中进行的两个现场试验和一个砂土中的模型试验研究,并且分析了一些试验曲线,总结了这3个试验对节桩承载机理的研究。
补充资料:吃一节,剥一节
1.犹言拖过一天算一天。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条