2) Double suspension jib
双吊点吊臂
4) three points hanging
三点吊挂
5) three-point lifting
三点吊
1.
Study of lifting scheme in double-hoist three-point lifting of reinforced concrete long post;
钢筋混凝土长柱双机三点吊吊装方案的研究
2.
According to the field demand of reinforced concrete long picket (post) hoisting, the hoisting plan in double-hoist three-point lifting is analyzed, its mathematical model is established, and some difficult problems are solved.
根据钢筋混凝土长桩(柱)吊装的实际工程需要,进行了双机三点吊吊装方案的研究分析,建立了 双机三点吊吊装方案的数学模型,编制了微机软件,解决了双机三点吊中的难题。
3.
For pole tower constructions in the trans-mission line, it is important to study optimaI three-point lifting in the pole tower integral hoisting.
根据输电线路中杆塔施工的实际工程需要,主要研究分析了整立电杆三点吊最优吊点的确定方法,建立了整体电杆三点吊的数学模型,编制了微机软件,解决了整体电杆三点吊方案设计中的难题。
6) double hook screw crane
双吊点螺杆启闭机
1.
By using double hook screw crane and connecting two screw cranes by an intermediate bearing and a gear coupling,the problem of inefficiency in door closing was solved.
以具体工程为例 ,在分析了螺杆启闭机在农田水利工程中应用时存在的问题及原因的基础上 ,提出采用双吊点螺杆启闭机 ,用中间轴与齿轮联轴器把 2台螺杆启闭机连接起来的方法 ,成功地解决了单吊点启闭机闭门力不足的问题 ,实现了双吊点螺杆启闭机工作时的同
补充资料:闭式单点、双点压力机
| |||||||
主要参数内容 | 国际先进 | 国内先进 | 国内一般 | 国内落后 | 评定方法及说明 | ||
(一)加工精度 | 参照GB10924-89、GB10933-89、JB5200-91 | ||||||
1、滑块下平面对工作台上平面的平行度(mm) | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.02+0.10/100×滑块下平面的被测长度 | |||||||
2、滑块行程对工作台上平面的垂直度 | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.05+0.02/100×滑块行程长度 | |||||||
(二)结构性能 | |||||||
1、离合器、制动器接通率,当滑块行程次数≤16次/分时为70%,≤25次/分时为60%,≤45次/分时为50% | 大于规定值10% | 大于规定值 | 达到规定值 | 达不到规定值 | |||
2、液压超负荷保险装置、微调装置、吨位指示器 | 全部具有 | 全部具有 | 部分具有 | 没有 | |||
(三)噪声dB(A) | |||||||
1、公称力≤400kN | ≤85 | ≤87 | ≤88 | >88 | |||
2、公称力>400kN | ≤87 | ≤88 | ≤90 | >90 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条