2) fuzzy measures
模糊测度
1.
The Application of Fuzzy Measures in Analysis of Rock Mass Displacement due to Underground Excavation in Mountainous Areas;
模糊测度在山区开挖岩体移动分析中的应用
2.
Fuzzy Measures Model for Analysis of Mine Slope Deformation under the Influence of Blast Vibration in Mountainous Areas;
模糊测度模型用于爆破震动影响下山区露天矿山边坡变形分析
3.
By using the fuzzy measures theory in fuzzy mathematics,the formulas of ground surface subsidence,horizontal displacement,inclination,horizontal strain and curvature are deduced.
针对柳山沟磷矿床地下开采自然坡失稳问题,应用模糊测度理论,推导了相应的地表下沉、倾斜、地表曲率、水平移动、水平变形的理论计算公式,对处于山区的柳山沟磷矿床地下开采所引起的地表移动与变形及山体失稳问题进行了具体分析。
3) fuzzy prediction
模糊预测
1.
Research of fuzzy prediction method on bending mould crack;
弯曲模故障模糊预测方法研究
2.
Analysis of sleeping physiological signals based on fuzzy prediction theory;
睡眠状态下人体生理信号的模糊预测分析
3.
Researching how to improving the fast algorithm accuracy of construction cost based on fuzzy prediction;
提高建筑工程造价模糊预测快速算法的精确度问题研究
4) fuzzy forecast
模糊预测
1.
Oneself accommodate fuzzy forecast of hot rolling mill rolling load;
热轧机组轧制负荷的自适应模糊预测
2.
It is proposed a fuzzy forecast control method based on support vector machine.
提出支持向量机-模糊预测控制方法,介绍支持向量机在列车启动控制过程中的应用。
3.
Through analysis of background on ready mixed concrete vocation in China,and author s observation, fuzzy forecast, test and verity for years, we have completed the first probe of state of ready mixed concrete vocation in China at 21th century early Stage.
通过对我国预拌混凝土行业背景资料的分析,结合笔者的长期观察、模糊预测和验证,完成了对我国预拌混凝土行业21世纪初叶态势的初探。
5) fuzzy measurement
模糊测度
1.
Fuzzy Measurement of High Dimensional Characteristic and Fast Genetic Detection for Interesting Image Target;
敏感图像高维特征模糊测度与快速遗传检测
2.
In order to measure the uncertainty of grinding force quantitatively, the symmetric fuzzy number in fuzzy set and the linear planning optimization theory are used to establish the fuzzy measurement model of grinding force, and then a crisp measurement method, defined as code modification, is presented.
为了定量测度磨削力的不确定性 ,运用模糊集合论中的对称模糊数和线性规划优化理论建立了磨削力的模糊测度模型 ,然后介绍了编码修正分明测度方法。
3.
The classifier s decision making ability is represented by fuzzy measurement,which can be interp.
各个分类器的判决能力用模糊测度表示,它可以解释为单个分类器判决对最终融合判决的重要程度。
6) fuzzy monitoring
模糊监测
1.
The design makes use of a powerful fuzzy logic tool box to perform the real-time fuzzy monitoring of the collected temperature signals in LabVIEW.
介绍了基于LabVIEW和Matlab的温度模糊监测系统的设计方案,阐述了温度测量原理、系统组成和软件实现方法。
补充资料:测试结果可接受性的检查和最终测试结果的确定
测试结果可接受性的检查和最终测试结果的确定
check of the acceptability of test results and determination of the final test result
C凡(3)二3.3d,时,取此3个结果的平均值作为最终侧试结果;否则取它们的中位数作为最终测试结果。。,为重复性标准差(即在重复性条件下所得侧试结果的标准差)。 在口田T 11792一1989中还对重复性和再现性条件下所得侧试结果可接受性的检查方法和最终测试结果的确定做了详细讨论和规定。(马毅林)ceshi 11叩uo kejieshCxjxing d6 iiancha he zuizhong ceshi】i闪旧de que心ing测试结果可接受性的检查和最终测试结果的确定(checkof山eac,ptability of test,ults助ddsterminationofthefi耐testresult)在商品检验中进行一次测试的情形不多见,当得到一个测试结果时,所得结果不可能直接与给定的重复性标准差作可接受性的检查。对测试结果的准确性有任何疑问时都应再进行一次测试。所以,对两个测试结果进行可接受性的检查是一般的情况。 可接受性的检查,实际上是一种统计检验。任何两个测试结果只要能通过可接受性的统计检验即可认为是一致的,均可接受。比如,在重复性条件下,所得结果之差的绝对值(下称绝对差)不超过相应的重复性限r(见重复性和再现性)的值,则认为两个结果是一致的,均可接受;如果两个侧试结果的绝对差超过r,则认为它们是不一致的,必须增加测试。 按国家标准《测试方法的精密度在重复性或再现性条件下所得测试结果可接受性的检查和最终测试结果的确定》(GBIT 1 1792一1989),在重复性条件下,如果两个测试结果的绝对差不超过r的值,可取两个侧试结果的平均值作为最终测试结果。如果两个结果的绝对差超过r的值,并且测试费用较低,须再做两次测试。当4个结果的极差(即其中的最大值与最小值之差)不超过相应的临界极差c,瓜(4)二3.6a,时,取4个结果的平均值作为最终测试结果。如果两个结果的绝对差超过r的值,并且测试费用较高时,只须再作一次测试。当3个结果的极差不超过相应的临界极差
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条