1) test execution order
测试执行顺序
1.
This paper mainly designed and implemented an automated test execution management tool,this tool could support serial,parallel,repeat,and distributed implementation of the test execution order,could monitor the implementation of real-time remote testing process and provide a detailed report and a variety of methods to analyze the data.
该工具提供串行、并行、重复和分布式等多种测试执行顺序,可实时远程监控测试执行过程,并可提供详细的测试报告和多样的数据分析方法。
2) execution control
执行顺序
1.
The loop detection and execution control of parallel ETL processes is discussed in the paper.
在流程的执行顺序上,采用基于有向图邻接表的深度优先遍历,并给出了具体算法流程;提出用有向图的回路检测解决流程的回环检测问题,并根据ETL工作中流程数少的特点改进了检测算法,降低了算法的实现复杂性,并给出了算法流程。
5) test order
测试顺序
1.
Research of the test order generation based on OMRD;
基于对象模式关系图的测试顺序生成方法
2.
This test order is very important since it affects the order in which clas.
OO软件集成测试的一个重要问题是确定被测试类的测试顺序。
6) testing,squential
顺序测试
补充资料:测试结果可接受性的检查和最终测试结果的确定
测试结果可接受性的检查和最终测试结果的确定
check of the acceptability of test results and determination of the final test result
C凡(3)二3.3d,时,取此3个结果的平均值作为最终侧试结果;否则取它们的中位数作为最终测试结果。。,为重复性标准差(即在重复性条件下所得侧试结果的标准差)。 在口田T 11792一1989中还对重复性和再现性条件下所得侧试结果可接受性的检查方法和最终测试结果的确定做了详细讨论和规定。(马毅林)ceshi 11叩uo kejieshCxjxing d6 iiancha he zuizhong ceshi】i闪旧de que心ing测试结果可接受性的检查和最终测试结果的确定(checkof山eac,ptability of test,ults助ddsterminationofthefi耐testresult)在商品检验中进行一次测试的情形不多见,当得到一个测试结果时,所得结果不可能直接与给定的重复性标准差作可接受性的检查。对测试结果的准确性有任何疑问时都应再进行一次测试。所以,对两个测试结果进行可接受性的检查是一般的情况。 可接受性的检查,实际上是一种统计检验。任何两个测试结果只要能通过可接受性的统计检验即可认为是一致的,均可接受。比如,在重复性条件下,所得结果之差的绝对值(下称绝对差)不超过相应的重复性限r(见重复性和再现性)的值,则认为两个结果是一致的,均可接受;如果两个侧试结果的绝对差超过r,则认为它们是不一致的,必须增加测试。 按国家标准《测试方法的精密度在重复性或再现性条件下所得测试结果可接受性的检查和最终测试结果的确定》(GBIT 1 1792一1989),在重复性条件下,如果两个测试结果的绝对差不超过r的值,可取两个侧试结果的平均值作为最终测试结果。如果两个结果的绝对差超过r的值,并且测试费用较低,须再做两次测试。当4个结果的极差(即其中的最大值与最小值之差)不超过相应的临界极差c,瓜(4)二3.6a,时,取4个结果的平均值作为最终测试结果。如果两个结果的绝对差超过r的值,并且测试费用较高时,只须再作一次测试。当3个结果的极差不超过相应的临界极差
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条