1) Visio 2003
Visio 2003
2) visio
VISIO
1.
Heat Economy Equation Recognition and Calculations of Power Plant Based on Visio;
基于Visio平台的火电厂热经济性状态方程识别及计算
2.
UML Modeling of Reservoir Resettlement MIS in Visio;
基于Visio的水库移民管理系统UML建模
3.
Protraction and Application of Electric State Analyzable Circuit Diagram Based on Visio;
基于Visio环境下电气状态分析电路图的制作与应用
3) 2003
2003
1.
Analysis of the Publications and Quotations in 2003 Journals of Shenyang Institute of Physical Education;
2003年《沈阳体育学院学报》载文及引文分析
4) Microsoft Visio
Microsoft Visio
1.
This disquisition studied the engineer design of the structured cabling system and the drawing software------Microsoft Visio,as well as the auxiliary design and the administration of the Premise Wiring System based on Microsoft Visio,and introduced the development of the auxiliary design and the administrative system of the Premise Wiring System.
本文对综合布线系统的工程设计内容和Microsoft Visio进行了研究,并对基于Microsoft Visio的综合布线系统辅助设计与管理软件进行了研究,介绍了综合布线系统辅助设计与管理系统的开发。
5) MS Visio
MS Visio
6) Microsoft Visio
Microsoft Visio软件
参考词条
2003年
Excel 2003
ISO10012:2003
VB.NET 2003
Access 2003
Windows 2003
Word 2003
Project 2003
Office 2003
Frontpage 2003
ProSa 2003
VS.NET 2003
VISIO建模工具
Visio二次开发
Microsoft Excel 2003
2003年业绩
Office Excel 2003
2003年汛期
组密钥协定
低聚葡萄糖
补充资料:JF2003三层筛操作规程
1、遵守《铸造设备通用操作规程》有关规定。
2、工作前,检查三角皮带的松紧度和磨损情况,如过紧过松或磨损严重,应予更换或调整。
3、工作前,检查筛网是否磨坏,吊杆是否紧固。如筛网磨坏或吊杆松动,应通知维修人员处理。
4、工作前,先点动试车,然后空运转2-3分钟,检查电动机、三角皮带和筛子的运动是否正常,确认一切正常后,方可进行生产。
5、设备运转正常后,方可加料,筛网上不许放料过多,以免超负荷使用。
6、工作后,筛面上不许存放砂子或其它物件。
2、工作前,检查三角皮带的松紧度和磨损情况,如过紧过松或磨损严重,应予更换或调整。
3、工作前,检查筛网是否磨坏,吊杆是否紧固。如筛网磨坏或吊杆松动,应通知维修人员处理。
4、工作前,先点动试车,然后空运转2-3分钟,检查电动机、三角皮带和筛子的运动是否正常,确认一切正常后,方可进行生产。
5、设备运转正常后,方可加料,筛网上不许放料过多,以免超负荷使用。
6、工作后,筛面上不许存放砂子或其它物件。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。