1)  ope ration plan
施工作业计划
2)  working division
施工作业区划
3)  working plan
工作计划,工作图,施工图
4)  routing planning
工序作业计划
1.
It can provide precise routing planning and optimal job scheduling, and then can get the dynamical optimal result of routing planning.
制造执行系统(MES)作为MRPII系统的扩充,是企业资源计划系统(ERP)与车间作业控制系统(PAC)的纽带,可对工序进行精确计划和排序,对车间作业优化调度,获得工序作业计划的动态最优解,从而使企业的生产管理和控制更加科学化、实时化和规范化。
5)  construction plan
施工计划
1.
This paper points out that before the construction of the coking oven,should compile the detailed and strict construction plan and construction period,and should implement the norms of the construction of the coking oven strictly,and puts forward some detailed methods for solving the problems frequently occurring in the construction of the coking ovens.
提出了砌筑焦炉前首先应编制详尽严谨的施工计划与工期,砌筑中严格筑炉规范。
2.
It is not until the beginning of actual construction that the construction planner can realize the validity of his construction operations planning.
工程施工计划是一项复杂的工作,不断增长的复杂因素决定了工程管理人员需要采取新的、从未被用过、检测过的工程施工方法。
6)  construction program
施工计划
1.
This paper describes and analyzes the relationship between FIDIC Contract Conditions and construction program preparation, implementation, management and construction progress control in the course of the construction of Paksey Bridge Project in Bangladesh, and also summarizes the experiences acquired in the implementation of the construction program in question.
对孟加拉国帕克西桥项目实施过程中FIDIC合同条款与施工计划的编制、实施、管理和施工进度控制之间的关系进行了介绍和分析,并对项目计划执行过程中的经验进行了归纳与总结。
补充资料:施工作业计划
      施工企业统一计划体系中的实施性计划。它把施工企业的施工计划任务、工程的施工进度计划和施工现场具体情况结合起来使之彼此协调,以明确的任务直接下达给执行者,因而是基层施工单位进行施工的直接依据。
  
  施工作业计划分月施工作业计划和旬施工作业计划。其内容一般由三部分组成:①本月(旬)应完成的施工任务。一般以施工进度计划形式表示,确定计划期内应完成的工程项目和实物工程量。②完成作业计划任务所需的劳力、材料、半成品、构配件等的需用量。③提高劳动生产率的措施和节约措施。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。