1) average processing time
平均加工时间
1.
The optimal design of processes - articulation - system is proposed in reference (1), and a formula for calculating the average processing time is given without a proof; this formula is proved in refreence (2).
文献[1]提出了工序连接系统优化设计问题,给出了计算平均加工时间的公式,文献[2]证明了该公式本文对该公式作了进一步改进,同时解决了产品加工过程中有分支辅助工序及库存成本不统一时的工序连接的优化设计问题;并以郑州铝厂水泥分厂普通水泥的生产工序为例,实际运用了该改进公式,取得了较好的成
2) Time weight average working resistance
时间加权平均工作阻力
3) time weighted average
时间加权平均值
4) time-weighted average
加权时间平均值
6) mean completion time
平均完工时间
1.
The problem of finding an optimal sequencing of n independent jobs to be processed on a single machine by minimizing the mean absolute deviation ( MAD ) of job completion time from the mean completion time is considered.
提出寻找n个独立工件在一台机器上加工,使工件完工时间与平均完工时间的平均绝对偏差(MAD)最小的最优排序问题。
2.
This paper is concerned with the problem of serial batching and schedulingto minimize mean completion time.
对于目标函数为平均完工时间的串联工件同时加工排序问题,本文证明在分批数固定时是NP_C 的,同时给出求解该问题的几个数学模型。
补充资料:访问者数目、平均停留时间和平均消费支出
访问者数目、平均停留时间和平均消费支出
小。访问者数目、平均停留时间和平均消费支出访问者数目指国外来访者入境人数(包括旅游者和短途旅行者)。停留时间指国外来访者在一国(旅游目的地国家和地区)内的度夜天数。平均停留时间,即平均停留天数,指报告期内平均每一个访间者停留的度夜天数。访问者在一国内停留时间的长短,与该国的旅游资源、旅游活动项目、旅游设施、旅游服务质量以及旅游行业部门的接待安排和旅游宣传等对访问者的吸引力大小有密切关系。它决定访间者的消费支出,也决定一国的国际旅游作业的收入。一国国际旅游业延长访问者的停留时间,等于接待了更多的访间者。因此,旅游目的地国家和地区把吸引更多的访问者到该国或该地区参观、游览、娱乐、消遣、休憩,并延长其停留时间作为提高该国该地区的国际旅游业经济效益的一个很重要的方面。其计算公式如下:平均停留天数一报告期接待人天数(度夜人天数)报告期接待人数(度夜人数) 有些国家和地区,特别是中小国家,通过接待国外来访者,还与该国或该地区的常住人口总数作比较.计算其旅游密度,以此说明该国该地区发展国际旅游事业的普遍程度,其计算公式如下:旅游密度-报告期国外来访者入境人数常住人口总数计算国外来访者平均消费支出,国际上一般用三个指标来表一是访问者平均每人每天消费支出额。计算公式为:访间者平均每人每天消费支出额报告期访问者消费支出总额报告期访间者度夜人天数这个指标的计算,不受访问者人数的多少和访问者停留时间长短的影响:二是访问者平均每人消费支出额,计算公式为:访问者平均每人消费支出额报告期访问者消费支出总额报告期访问者人数 报告期访问者平均、报告期平均一~,~一、、,,~,一入~,一一,~ 母人母大泊费支出钡停留大叙这个指标的计算,不受访问者人数多少的影响.但受停留时间长短的影响。停留时间长,每人消费支出就大。反之,则小。 三是访问者平均每天消费支出额.其计算公式为:访间者平均每天消费支出额报告期访问者消费支出总额报告期日历天数报告期访问者平均、报告期日~~一、、,~..一入一,,母人母大摘费支出钡十均人致这个指标的计算,不受停留时间长短的影响,但受访问者人数多少的影响。访问者人数愈多,日平均消费支出额就愈大反之.则愈