说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 最大水印容量
1)  maximum watermark capacity
最大水印容量
2)  maximum water capacity
最大含水容量
3)  watermark capacity
水印容量
1.
In order to solve the problem of the insuffieient watermark capacity in the current algorithm of frequency domain transformation,A digital watermarking algorithm based on pixel permutation and dual sequence pseudo random noise spread spectrum is proposed in this paper.
针对目前比较流行的频域(或变换域)水印算法中存在的水印容量不足的问题,提出了基于像素置乱的双伪随机序列扩频水印算法,提高了水印的容量,具有较好的鲁棒性和抗各种攻击的能力。
2.
Propose a wavelet adaptive watermarking algorithm which can effectively increase the watermark capacity on the basis of analyzing the restricted relationships between invisibility,robustness and capacity of image digital watermarking.
在分析图像数字水印不可见性、鲁棒性与水印容量三者之间制约关系的基础上,提出了一种可以有效增加水印容量的小波域自适应水印算法。
3.
An important conclusion is found,which is watermark capacity and rubustness are conflict.
介绍数字水印技术的基本原理,详细论述基于最低有效位数字水印技术的实现过程,结合实际应用提出改进方案,通过Matlab实验给出同一载体图像嵌入不同容量水印后图像的PSNR值,得出了水印容量和鲁棒性相互制约的重要结论。
4)  watermarking capacity
水印容量
1.
For the analysis of how much information can be hidden in digital image, a content adaptive watermarking algorithm is presented and watermarking capacity is discussed in this scenario.
为了研究图像的水印容量,在满足水印不可感知性的前提下,基于图像的内容自适应地限制水印的嵌入功率,分析了水印容量问题以及水印容量与检测可靠性的关系。
2.
But the relationship between perceptual model and watermarking capacity has not been considered enough.
但感知模型和水印容量间的关系还没有受到应有重视。
3.
The marked codes are decided by the characteristic of the document,and the watermarking capacity decided by the amount of marked codes can also be flexible.
该方法的水印容量由标志代码的数量动态确定,可自主的提高水印容量。
5)  maximum capacity
最大容量
1.
Determination of the maximum capacity of power generator for Jilintai First-cascade Hydropower Station;
吉林台一级水电站发电机最大容量设置
2.
In view of the large head variation in Longtan hydropower station and the turbine′s operation stability,this paper gives suggestion to raise the rated head of turbine or set a maximum capacity of generator of continuous operation .
由于龙滩电站水头变幅较大 ,考虑水轮机运行稳定性 ,建议提高水轮机额定水头或设置可连续运行的发电机最大容量。
3.
According to the requirements of the international bidding for the generating units of Ertan Hydropower Station,the selection and verification of the main parameters and structural types (such as rated power factor,maximum capacity,temperature rise limit,rated voltage,cooling way,braking type,short circuit ratio,reactance value,the position of thrust bearing,etc.
由于二滩水电站机组国际招标的需要,通过专题研究和对外技术交流,对二滩水轮发电机的主要参数和结构型式,如额定功率因数、最大容量和温升限值、额定电压、冷却方式、制动方式、短路比和X′d、X″d电抗值、推力轴承的位置等,进行了选择和论证,作为标书编制和合同谈判的依据。
6)  Peak sink
最大库容量
补充资料:透平发电机最大容量或输出功率


透平发电机最大容量或输出功率
turbogenerator maximum capacity

touPing fodI0nll zuldo rong}Iong huo ShuChu gonglU透平发电机最大容,或输出功率(t盯bogen-erator maximum eapaeity)当冷却介质压力在高限,介质温度在低限或规定值,而除电流外的其他参数均在额定值时透平发电机允许的最大连续负载,用kV .A或MV .A表示。 汽轮机在一定条件下容许在发电机端连续愉出最大功率。汽轮机的最大功率也称保证最大连续出力(MCR),是指汽轮机在制造厂所保证的最大连续进汽量及所规定的工况条件(如冷却水温度)下在发电机端连续翰出的功率。有些国家要求发电机的最大容量与汽轮机的最大输出功率相匹配。美国要求发电机的额定功率与汽轮机的最大计算出力相匹配,不主张降低冷却介质的温度来提高发电机的过载能力。根据原苏联国家标准,如冷却水温度不超过20‘C(对额定功率为SOoMW及以上的机组,不超过33℃),功率因数为额定值时.汽轮发电机允许长期带110%额定有功功率运行。 嫩气轮发电机的峰值容量是指在额定频率、额定电压和额定功率因数以及二次(最终)冷却介质(水或空气)温度在现场运行规定范围内时,发电机的温升和温度可比基本容量时(见透平发电机倾定功率)高15℃时的发电机出线端连续翰出的视在功率。但以峰值容量运行时,绝缘老化速率是基本容量时的3~6倍,将导致电机寿命缩短.嫩气轮发电机作为调峰用时,可在峰值容量运行。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条