说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 系级资料室建设
1)  construction of department reference room
系级资料室建设
2)  construction of reference rooms
资料室建设
1.
To strengthen the construction of reference rooms in the universities is the objective requirement of teaching and research development.
加强高校院(系)资料室建设是高校教学与科研发展的客观要求,也是高校院(系)资料室自身发展的内在要求。
3)  construction of reference room
资料室建设
1.
This paper expounds the important significance of the construction of reference room in local university under the new situation,analyzes the problems existing in the construction of departmental reference room,and expounds some countermeasures for the construction of efficient and convenient departmental reference room.
概述了新形势下地方高校资料室建设的重要意义,分析了系级资料室建设存在的问题,阐述了建设高效便捷系级资料室的对策。
4)  datum-room in department
系级资料室
1.
The construction of datum-room in department should center the construction of subjects.
普通高校系级资料室的建设要以服务学科建设为中心,资料室应充分发挥自身优势,突出专业特色,拓宽服务渠道,大力拓展个性化的信息服务,提高资料室为学科建设服务的质量。
5)  reference management and construction
资料室管理和建设
6)  The construction of the materials
资料建设
补充资料:建设竣工资料的报送

《城市规划法》第三十八条规定:“建设单位应当在竣工验收后六个月内向城市规划行政主管部门报送有关竣工资料。”竣工资料包括该工程的审批文件(影印件)和该建设工程竣工时的总平面图,各层平面团、立面图、剖面图、设备图、基础图和城市规划行政主管部门指定需要的其他图纸。竣工资料是城市规划行政主管部门进行具体的规划管理过程中需要查阅的重要历史资料,因而任何建设单位和个人都必须依法执行。目前,有的城市规划行政主管部门采取收取保证金的办法,以保证及时取得竣工资料,实施证明是一项行之有效的措施。各级城市规划行政主管部门在制定城市规划实施管理办法时,应当对竣工资料的要求,保证金的收取及违反规定的处罚等作出具体规定。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条