1) V notch weir
测流堰
1.
Site selection and design of V notch weirs in three different forested catchments (tropical seasonal rainforest,rubber plantation,and farmland) in Xishuangbanna are discussed.
讨论了西双版纳地区热带雨林、人工橡胶林和无林农耕地集水区测流堰的选择与设计 ,并扼要介绍了集水区测流堰建设中应该注意的问题。
2) flow-measuring weir
测流堰槽
1.
In this paper, to solve the problem in discharge measurement in steep rivers that have great peak flow,more sediment and short flood duration,flow characteristics and applied conditions of the compound flow-measuring weir and influence factors of discharge coefficient have been studied by experiments.
针对山区陡坡河道洪峰流量大、历时短和泥沙含量高的特点,提出一种组合测流堰槽,并通过试验分析了该测流槽的水流特性、影响流量系数的因素和实用条件等,证实该测流槽能用于陡坡河道上测流,并给出了水位 流量关系的计算公式。
3) discharge measurement by weir
量水堰测流
4) flow-measuring flume
测流槽(或量水堰)
5) weir
[英][wɪə(r)] [美][wɪr]
堰;溢流堰
6) weir flow
堰流
补充资料:肩舆历湖桑堰东西过陈湾至陈让堰小市抵暮乃
【诗文】:
贪看西南一面山,不知信步到陈湾。
未言散释经旬病,且要消磨半日闲。
蔬陇过寒常郁郁,鸟声迎暖已关关。
斜阳不为行人驻,十里钟来翠霭间。
【注释】:
【注释】:原题:肩舆历湖桑堰东西过陈湾至陈让堰小市抵暮乃归
【出处】:
贪看西南一面山,不知信步到陈湾。
未言散释经旬病,且要消磨半日闲。
蔬陇过寒常郁郁,鸟声迎暖已关关。
斜阳不为行人驻,十里钟来翠霭间。
【注释】:
【注释】:原题:肩舆历湖桑堰东西过陈湾至陈让堰小市抵暮乃归
【出处】:
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条