2) constructive program of territory
村镇建设用地规划
4) village and town construction
村镇建设
1.
This paper states the direction and necessity of village and town construction, which should have comprehensive planning and compositive construction.
本文阐述了村镇建设发展的方向及必要性,应全面规划、综合建设、量力而行、逐步建设。
5) urban construction land
城镇建设用地
1.
Analysis on the formation mechanism and implication of urban construction land potentiality;
城镇建设用地潜力形成机制及内涵分析
2.
This paper introduces the principles that should be followed in the urban system planning,and points out that the towns should select the developing road of "the modernization of the town,the urbanization of the country,and the integration of the town and country",and carry well out the coordination of the urban construction land and the green open space.
介绍了城镇体系规划应遵循的原则,提出城镇应选择“城镇现代化、乡村城市化、城乡一体化”的道路发展,通过强化区域协调的手段做好城镇建设用地和绿色开敞空间的实施工作。
3.
Simultaneously,considering its middleterm and long-term planning goals of local economical and social development,the amounts of requirement of urban construction land(UCL) from 2010 to 2020 year were forecasted.
为了探讨城镇建设用地的规划预测值与实际需求量的一致性,利用宜昌市1996—2004年土地利用变更数据和社会经济统计资料进行了关联度分析,并结合该市国民经济和社会发展的中、长期规划目标,预测了2010—2020年城镇建设用地的需求量。
6) urban constructive land
城镇建设用地
1.
The predicting method on urban constructive land is discussed in this paper,adopting the means combined with the qualitative analysis and the quantitative calculation.
在对城镇建设用地需求量预测方法探讨的基础上,结合城镇存量建设用地专项调查成果,分析了城镇存量建设用地集约利用的潜力构成、面积;对肥东县城镇新增建设用地与存量潜力进行了统筹配置。
2.
This paper takes the urban constructive land in 1995 and 2005 as the research object.
随着三峡大坝的修建,三峡经济飞速发展,带动了利用三峡库区城镇建设用地的变化。
补充资料:在什么情况下用地单位的有关用地收回
答:用地单位有下列情况之一者,该用地由城市规划行政主管部门收回另行处理:
1、不按批准的用途使用的;
2、用地单位民已经撤消或迁移的;
3、未经城市规划行政主管部门同意延期,连续两年未使用的;
4、建设用地规划许可证被吊销的;
5、市政设施、军事设施、铁路、公路、机场、抗场等用地经过核准不用的;
6、用地单位因建设计划变更不再使用或多余的;
7、用地单位闲置的土地;
8、未取得建设用地规划许可证而取得建设用地地批准文件、占用土地的;
城市规划行政主管部门有权根据城市规划建设需要,对城市规划区内的土地进行再按排。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条