1)  potential
蕴藏潜力
2)  deposit
蕴藏量
3)  peat distribution
泥炭蕴藏
1.
Through rectifying and restatistics of the peat reserve data attached to “REPORT ON PEAT RESOURCES IN CHINA”, this paper deals with the spatial pattern of peat distribution among provinces, three topographical units and climatic zones respectively.
省际泥炭蕴藏具有明显的不平衡性 。
4)  Year reserves
年蕴藏量
1.
Total area is 434527hm2Year reserves is over 59.
哲里木盟麻黄主要分布于黄土丘陵、沙丘沙地、石质山坡等草原区,总面积434527公顷,年蕴藏量5950万公斤,年生产量4765万公斤。
5)  ways of storage
蕴藏方式
1.
The ways of storage can be judged through analyzing how much the brain holds information, bioelectricity reaction, exchanging information between two cerebra hemispheres and information in vital brain sections, or through exerting brain potentials externalized, in which process psychological and managing approaches, or psychological potential and managing potenti.
大脑潜能的蕴藏方式是多样化的 ,大脑潜能的产生有先天的因素 ,但主要是后天学习和实践沉淀的结果。
6)  overall abundance
总蕴藏量
参考词条
补充资料:水能理论蕴藏量


水能理论蕴藏量
theoretic resource of hydraulic energy

shuineng IIlun yuneangliang水能理论蕴藏t(thcoretiC~ureeof场山妞ulic ener-gy)陆地上的河流在天然状态下所蕴藏的水能量。估算水能理论蕴藏量是水能利用的首要问题,是说明一个地区、国家水能资源丰富程度的客观指标,也是水能资源研究中的基础资料。 估算河流水能理论蕴藏量时,须把一条河流分为若干河段,选择河流分界点时,须考虑河床的纵剖面特性和支流的位置,最好在河床坡降发生变化之处和较大支流注人之处,作为河段的分界点。如果将河段分得愈多,河流的水文资料和地形资料掌握得愈详细,愈准确,那么河流水能理论蕴藏量估算得也愈准确。河流水能理论蕴藏量估算中,一般先按N河段二9.slH河段Q(千瓦)计算出每一河段的出力,此处Q为河段末端的多年平均流量(米3/秒),然后把各河段出力累加得出全河流的出力。从这里可以看到,河段分得越多,计算工作量越大。由河流出力计算年电量,一般按E=87印xN(千瓦·小时)得出。 世界能源会议1980年调查了全世界的水能理论蕴藏量,累计为44.28 xl俨千瓦·小时/年,约合50.54 xl护千瓦,其中以亚洲的资源最为丰富,为16月肠xl口2千瓦·小时/年,占全世界的37 .2%;非洲居第二位,为10一15 x 10,2千瓦·小时/年,占世界22.9%;北美洲居第三位,为6.巧x 1012千瓦·小时/年,占世界13.9%。世界水能理论蕴藏量分布见下表。 世界水能理论趁藏,统计表几几 注:世界能源会议19即年调查统计数字。 l叫9年后,中国对水能理论蕴藏量进行过3次估算:1954~1955年,由燃料工业部水力发电建设总局主持进行,得出全国水能理论蕴藏量为5.4 xl护千瓦,4.73 x 1012千瓦·小时/年;1956“1958年,由电力工业部与水利部共同组织普查,估算得出全国水能理论蕴藏量为5.8 xl护千瓦,5.08x 1012千瓦·小时/年;l卯7~1980年,由水利电力部组织全国各流域机构、部直属勘测设计院和各省市有关水利水电单位再次复核、补充查勘后得出全国水能理论蕴藏量为6.76xl护千瓦,5.92xl012千瓦·小时/年。(朱成章)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。